My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-011029 - septic
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive W
>
0150 North Shore Drive West - 06-117-23-22-0023
>
Septic
>
1998-011029 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:15:02 PM
Creation date
2/7/2018 10:39:27 AM
Metadata
Fields
Template:
x Address Old
Address
0150 North Shore Dr W
Document Type
Septic
PIN
0611723220023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO SEPTIC SYSTEM PERiMIT APPLICATION <br /> Box 66 (2750 Kelley Parkwav) <br /> Crystal Bay, rvLN 55323 <br /> JOB SITE ADDRESS: <br /> —4salL <br /> Occupancy Type: - Residential`_ Commercial Other <br /> s <br /> Permit Type: New or Replacement. System, $100.00 ' <br /> Repair Existing System, $ 50.00 <br /> (Tanks or Drainfield) <br /> 0.50 State surcharge added to above fees <br /> ,1. . . *See fee schedule for non-residential permit fees <br /> Owner's Name: PhoneNumber• <br /> Mailing Address: City: per!^� ._—��G <br /> Contractor's Nam e: 0W� > <br /> e__ PhoneNumber: <br /> ' G� <br /> Mailing Address: City• <br /> DO-NOT 1VL4M PAYINIENT NVITH THIS APPLICATION <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be.mailed out. The permit must be picked up in <br /> person at the City Offices and work must not begin unless the permit card is on the job <br /> site. <br /> 2. Permits will be issued only to contractors holding a City of Orono Septic System <br /> Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design <br /> reports are not considered approved unless accompanied by the "City of Orono Septic <br /> System Approval cover sheet-signed by the City Inspector. <br /> 4. The following inspections will be required for all.septic systems: <br /> A. Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. Q inspection is required <br /> C. Drainfield trench installation prior to covering. For mounds, <br /> after rough-up but prior to sand placement (sand will be jar tested for silt content), <br /> and again during pressure distribution piping installation in trock b • station <br /> D. Final inspection to verify proper final cover depths and to verifythat all pump <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding MPCA Installer,Certificate shall be present during inspections: A 24- <br /> hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.