My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-011029 - septic
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive W
>
0150 North Shore Drive West - 06-117-23-22-0023
>
Septic
>
1998-011029 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:15:02 PM
Creation date
2/7/2018 10:39:27 AM
Metadata
Fields
Template:
x Address Old
Address
0150 North Shore Dr W
Document Type
Septic
PIN
0611723220023
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S=P TESTING, INC. Steven B. Schirmers - MPCA Cert.No. 627 <br /> 951 Katydid Lane NE - St. Michael, MN 55376 - (612) 497-3566 <br /> FAX (612)-497-5011 <br /> State License#394 <br /> April 29, 1996 <br /> Hilloway Corporation <br /> Lot 5 <br /> Co.Rd.19 & 84 <br /> Sub-Division <br /> Orono, Henn. Co., MN <br /> This on-Site Sewage Treatment System is Designed for a Type 1, five bedroom home <br /> designed in accordance with the Minnesota Pollution Control Agency Chapter 7080 and <br /> local ordinances. <br /> The soils on this site are SCS soils mapped - KkB - Kilkenny loam. The seasonally <br /> saturated soils were located at 14"to 22" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate averaging 5.2 mpi. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.