All property lines will need to be located prior to Installation. <br /> The tanks will need to be a Darwin pre-cast 2000 gallon spilt reversed,750 gallon <br /> trash trap&1250 gallon pumping chamber#1 with a timer pumping 15.6 gallons <br /> every 30 minutes with a to the Multi-Flo Unit. The affluent will flow gravity from the <br /> Multi-Flo to a now 1600 gallon pumping chamber(pump#2)which will pressurized <br /> the seepage bed. The power supply&switches must be located outside the <br /> manhole&pumping chamber in a weather proof enclosure. A warning device must <br /> be Installed with a light 8.sound device. This is In case of a pump failure. <br /> Monitoring of the drainficld&Multi-Flo will need to be completed per operating <br /> permit. <br /> If the tanks have less than 2'of cover,the lids,risers &maintenance hole covers <br /> must be Insulated to a value of R10. <br /> Cieanouts for each lateral must be Insulated&be accessible from finished grade in <br /> an irrigation box with a ball valve. <br /> A water motor or event counter must be,Instatled to monitor daily Water use. The <br /> homeowner is responsible for the water meter readings. <br /> The mitigation plan is if hydraulic overloading would occur,a timer could bo Installed <br /> to reduce the amount of effluent pumped to the system and also by using the 1500 <br /> gallon pumping chamber allows the effluent to be stored during peak use and <br /> pumped to the system during low water use periods. The second would be to Install <br /> holding tanks. <br /> All neighboring walls aro located greater than 100'away from the proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should bo marked off before construction. This <br /> design is not valid &the system will need to be relocated If failure to protect the <br /> sites for new on-site sewage systems. <br />