Laserfiche WebLink
INSPECTOR CHECKLIST -Multi flow-Pressure bed <br /> 753 Ferndale Rd.Orono <br /> ❑ W .L.Eoblate 2'to pressure tasted sewer line (5 pa for 15 rite) <br /> 50 to ewaygekc 100 to dope sat area with shallow wdl <br /> PROPERTY LOEB atbhale 1d to everything <br /> ReN adirda glade&ter prep line. Metas ff:bounds:out of road easement,or outer ditch. <br /> LAXB/BLUPP subset Wfor Muff. Ulm GD_,,RD,KE-__. Protectedwat6atd_,,, <br /> Blaktsded* 10 forevay@drrg, 20'for dhpetatarea. <br /> WAitI u u ander prawn 1110'to bed tank 8:Sewer lb*.(abet sewer One•1r below) <br /> ❑ Sewer lite a baffle commotion (no 90Y, r bah nen Ods,slope rake r in r,marc r fn 8). <br /> (cu depth rte, dean eat every 100, Sdh 40 trip.) <br /> ❑ Sepmc tuck and arms Crater 0104 hnwtletod,P *PM.extte miffed by pumpblg) <br /> raft/ _ Woo pitons trash ttap/muAtldtow dose tank <br /> [j Riser over cutlet, riser over tntet or anter,and V*despecdon pipe over any remaining baffles. <br /> 750 gallon Ahtlti flow unit W tight regdd lit <br /> Treatment pump 30 Upra01 18.6 pat 37 sec ON 29.4 mks OW <br /> ❑ 17 ft 2 knelt supple line <br /> timer ON float 10 indracfiora�ottom M1t75%tank aqui/ <br /> ❑ Dose tank maces and piping (water tett,bnsr4stad,proper depth,drabibftk) <br /> ❑ mfg,„____ 1900 pattens <br /> dose tip 45 gpm 14 head VERIFY MAW CURVE 4.2 min ON 9 hr OFF <br /> Boat <br /> setting drop 7.6 indite at 23 . • 'MOW <br /> 1%70 gal dose&shied by gill'Ol1TALIEW- taches float drop(field corrected) <br /> lAia pump requiraments and drawdown on akar a pond <br /> ❑ Cam lock evadable from grade-30'mac J-hank weep hots. Supply Una access (no hard 40s) <br /> ❑ 24 tach amply pipe scMO,stoped 1/r... supported by 4•sc140 deem or completed, and burled 6- <br /> ❑ splice book/control panel/electrical connections <br /> ted dbrkrotan 21 X 43.8 <br /> Rode depth below pipe 12 lndtes <br /> HRode bottom elevation 34.0 Ind=horn Grade to bottom of rock(max) <br /> oorrerdepth of 1r• VERIFY <br /> 7 intens (1-2'from edge of rock) <br /> inch pipe she (wh40 pipe a fittings) <br /> 3.0 R lateral spacing <br /> 0 3/16 inch perforations (smaller Is oft) <br /> ❑ 34 R perforation spacing <br /> 0. Air Net at end of laterals, and at tap feed manifold. YE/UV <br /> dew outs (deep bed r of heed) (no hard 90!) <br /> 4•kapection pipe to bottom of sods,anchored VERIFY <br /> ijAbate:10 emitGates aneasen► Qllwe a int tankcer o n secoltorbip plan and type <br /> nett abadausaat tf mammy <br />