My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
05-15-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 2:22:29 PM
Creation date
2/6/2018 2:21:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,April 17,2017 <br /> 6:30 o'clock p.m. <br /> proposed Lot 1. Gaffron stated he is not sure whether there is any possibility of moving one of the lot <br /> lines or putting it at an angle. Gaffron stated this is one of those situations where there needs to be <br /> attention to details. <br /> Thiesse asked if the average lakeshore setback would be established at the time of subdivision approval. <br /> Gaffron indicated it would be, <br /> Thiesse asked if the applicant knows what stormwater management will be done. <br /> Fretham stated he has an idea of what needs to be done. <br /> Thiesse commented the applicant should be aware that he is surrounded by a lake that Orono takes great <br /> steps to protect. <br /> Gaffron stated as part of a preliminary plat application, Staff will need to know where the fire and police <br /> chiefs stand on things,especially as it relates to emergency access and turnaround. Gaffron stated this is <br /> an opportunity to resolve some issues but they might not be able to accomplish everything on this <br /> property. Gaffron stated if improvements need to be made to the cul-de-sac,the greater question becomes <br /> where the land for road or turnaround expansion comes from. <br /> Thiesse asked if there is a lift station in the area. <br /> Gaffron stated there is a lift station as well as a sewer line that goes along the shore. The applicant will <br /> have the ability to utilize that existing line. <br /> Thiesse asked if there are any definitions for single-story or whether they would be allowed 14 or 16-foot <br /> ceilings with a pitched roof. <br /> Fretham stated the language(of the easement) is vague. <br /> Lemke commented it would be nice to go above the single story to lessen the footprint. <br /> Page 52 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.