My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-15-2017 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2017
>
05-15-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 2:22:29 PM
Creation date
2/6/2018 2:21:34 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,April 17,2017 <br /> 6:30 o'clock p.m. <br /> 4. Consider if there are any significant impacts of the road location to adjoining properties,and if so, <br /> are there alternative configurations or mitigations that would reduce such impacts if needed. <br /> 5. Address the fact that sewer maintenance access is critical and must be addressed as part of the <br /> subdivision process,likely requiring new easements and potentially buffer width averaging. <br /> 6. A new sewer connection for Lots 1 and 2 will have to be established,and an easement for the <br /> connection for Lot 3 over Lots 1 and 2 needs to be addressed as part of the subdivision process. <br /> The Planning Commission should review the Staff report as well as the submitted documentation. The <br /> Planning Commission should hold the public hearing and then make a recommendation for either <br /> approval or denial. Staff will not present this application to the City Council for review until the updated <br /> wetland delineation has been submitted. <br /> In addition,the applicant should plan to meet with the Orono Public Works Sewer and Water Supervisor <br /> as soon as possible to review the route for sewer maintenance vehicles. <br /> Lemke asked if there is any advantage to having the cul-de-sac go in so far. <br /> Gaffron stated that results in shorter driveways but noted the cul-de-sac could be shortened up further. If <br /> the area on the west side of Lot 1 has value as yard,changing the length of the cul-de-sac might change <br /> the nature of the yard. <br /> Landgraver asked if there is precedent for the city maintenance road. <br /> Gaffron stated it is likely there are other places where the Public Works Department has to drive over <br /> private property to maintain the sewer system since the City has approximately 40 lift stations. There is <br /> an agreement currently for maintenance of this road up to a certain point and that agreement will have to <br /> be revised. <br /> Page 6 of 72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.