My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
04-17-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 10:52:12 AM
Creation date
2/6/2018 10:49:41 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
T <br /> FILE#17-3928 <br /> 17 April 2017 <br /> Page 4 of 4 <br /> driveway for a tuck-under garage.The proposed home will have a first floor garage elevated above <br /> the current grades by approximately 7 feet. <br /> Engineer Comments <br /> The City's engineer has conducted a preliminary review of the proposed grading plans; more <br /> detailed review will be performed at the time of the building permit and additional conditions <br /> may be applied at that time. <br /> Public Comments <br /> The public comments received are included as Exhibit J. <br /> Issues for Consideration <br /> 1. Does the Planning Commission find that the conditional use permit, if granted, will <br /> not alter the essential character of the neighborhood? <br /> 2. Does the Commission find it necessary to impose conditions in order to mitigate the <br /> impacts created by the granting of the requested conditional use permit? <br /> 3. Are there any other issues or concerns with this application? <br /> Planning Staff Recommendation <br /> Planning Staff recommends approval of the conditional use permit with the following conditions: <br /> 1. City engineer and watershed district shall approve the erosion control plan. <br /> 2. The street swept daily, or as needed,to keep debris off of Casco Point Road. <br /> 3. The applicant must conform to the City's and MCWD's erosion control regulations. <br /> 4. Only clean fill to be imported to the site. <br /> 5. Conformance with the City Engineer's requirements at the time of the building permit. <br /> 6. Hauling shall occur during allowed construction hours only Monday through Friday 7 am <br /> to 8 pm (and between 8 am and 8 pm on weekends and holidays). <br /> 7. Contractor shall post a contact number and be able to respond to complaints in a timely <br /> fashion. <br /> List of Exhibits <br /> Exhibit A. Application <br /> Exhibit B. Narrative <br /> Exhibit C. Proposed Survey/Site Plan <br /> Exhibit D. Proposed Plans and Elevations <br /> Exhibit E. Submitted Hardcover Calculations <br /> Exhibit F. City Engineer Memo <br /> Exhibit G. Site Photos <br /> Exhibit H. Property Owners List <br /> Exhibit I. Plat Map <br /> Exhibit J. Neighbor Comments <br />
The URL can be used to link to this page
Your browser does not support the video tag.