My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
04-17-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 10:52:12 AM
Creation date
2/6/2018 10:49:41 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,March 20,2017 <br /> 6:30 o'clock p.m. <br /> The proposed site use plan indicates the proposed rock construction entrance will be located where the <br /> approved future residential access would be located. This access point has been approved by Hennepin <br /> County as a temporary construction access. Gaffron stated he is not sure whether Hennepin County will <br /> require some sort of additional turn lanes,temporary or permanent, in the area. Since it is a county road, <br /> Hennepin County will need to make that determination. <br /> The Minnehaha Creek Watershed District has approved an Erosion Control permit for the construction <br /> staging activity. <br /> The Long Lake Fire Chief has indicated no issues with use of the site for construction staging. The <br /> Orono Public Works Director has indicated this location is likely as good a location as the contractor will <br /> find for construction staging. <br /> The site plan suggests that temporary lighting will likely be used,and it is likely that to minimize impact <br /> on traffic flow, some work on the highway improvements will be at night. It would be appropriate to <br /> establish that any temporary lighting be downcast and directed away from residential areas. <br /> The site plan indicates a proposed visual and noise screening berm along the west and south boundaries of <br /> the site. The applicant is working with the MPCA to establish parameters and obtain permits for this <br /> berm which will become an amenity for future residential development. The City will require a grading <br /> plan be approved for this and it potentially will require a Conditional Use Permit based on the volume of <br /> permanent fill material. <br /> The applicant's narrative suggests that this site might be used as a recycling yard for projects other than <br /> just the Wayzata Boulevard improvements. This could put a different slant on how the site is intended to <br /> be used. The applicants should describe what is actually intended and how the contractor or Hennepin <br /> County expects to operate this site. <br /> Questions to be answered include whether materials from the Wayzata Boulevard project will be recycled <br /> and head out to other projects not in Orono and whether it is the City's expectation that this site is <br /> intended to be in use exclusively for the Wayzata Boulevard project and not as a regional recycling yard <br /> for other projects. Staff recommends that this industrial-level use at this site not become a regional <br /> Page 16 of 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.