My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-17-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
04-17-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2018 10:52:12 AM
Creation date
2/6/2018 10:49:41 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SHOREWOOD <br /> Subd.4. Interim conditional use permit. <br /> a. Purpose. The purpose and intent of an interim conditional use permit is: <br /> l (1) To allow a use for a brief period of time while permanent location is obtained or <br /> constructed; or <br /> (2) To allow a use that is presently judged acceptable by the City Council, but that with <br /> anticipated development or redevelopment,will not be acceptable in the future; or <br /> (3) To allow a use that is reflective of anticipated long range change to an area and that is <br /> in compliance with the Comprehensive Plan, provided that the use maintains harmony and <br /> compatibility with surrounding uses and is in keeping with the performance standards of this <br /> code; or <br /> (4) To provide a mechanism for allowing changes to a nonconforming use of property <br /> contingent upon a plan for cessation of the nonconforming use within a specified period of <br /> time. <br /> b. Informational requirement and procedure. The information required and the procedure <br /> to be followed for all interim conditional use permit applications shall be the same as that <br /> required for a conditional use permit as provided for in this section. 4,...-----, <br /> c. Termination. An interim conditional use shall terminate on the happening of any of the <br /> following events, whichever occurs first: <br /> (1) The date stated in the permit; <br /> (2) Upon violation of conditions under which the permit was issued; <br /> (3) Upon change in the city's zoning regulations that renders the use nonconforming; <br /> (4) The redevelopment of the use and property upon which it is located to a permitted or <br /> conditional use as allowed within the respective zoning district. —.._.1 <br /> d. General standards. An interim conditional use permit shall comply with the following: <br /> (1) Conform to the applicable general building and performance requirements of§ <br /> 1201.03,Subd. 2 of this code; <br /> (2) The use is allowed as an interim use in the respective zoning district; '[�� <br /> /‘ <br /> (3) The date or event that will terminate the use can be identified with certainty; T <br /> (4) The use will not impose additional unreasonable costs on the public; <br /> V <br /> V <br />
The URL can be used to link to this page
Your browser does not support the video tag.