Laserfiche WebLink
CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br /> Bos 66(2750 Kelley Parkway) <br /> Crystal Bay,Mn 55323 <br /> `JOB SITE ADDRESS (1 �U O vve be <br /> Occupancy Type: Residential)/ Commercial Other <br /> Permit Type: New or Replacement System $100.00 <br /> Repair Existing System $ 50.00 <br /> (Tanks or Drainfield) <br /> $0.50 State surcharge added to above fees <br /> * See fee schedule for non-residential permit fees <br /> Owner's Name:54-fI�w�: �_c,,,,,.P _ Phone Number: <br /> Mailing Address: I go e- . City: Zip: <br /> Contractor's Name: t_.r,�% + ��s � . Phone Number: 76�- 9f7V_/2G z_ <br /> Mailing Address:2�3 2 — s(, S• 1��. City:/9?oin--wsc Zip: -553,rea <br /> *** <br /> DO NOT 1VIAIL PAYMENT WITH THIS APPLICATION"* <br /> * <br /> GENERAL INSTRUCTIONS <br /> 1. Applications for septic system permits may be mailed or submitted in person at the City <br /> Offices; however, permits will not be mailed out. The permit must be picked up in person <br /> at the City Offices and work must not begin unless the permit card is on the job site. <br /> 2. Permits will be issued only to contractors holding a Minnesota Pollution Control <br /> Agency(NIPCA) Septic System Installers License. <br /> 3. All work must be done in accordance with the approved septic system design. Design reports <br /> are not considered approved unless accompanied by the "City of Orono Septic System <br /> Approval' cover sheet signed by the City Inspector. <br /> 4. The following inspections will be required for all septic systems: <br /> A Pre-installation site inspection to include inspector, installer, and general contractor. <br /> B. Tank installation prior to covering. _ <br /> C. Drainfield trench installation prior to covering. For mounds, inspection is required after <br /> rough up but prior to sand placement(sand will be jar tested for silt content), and again <br /> during pressure distribution piping installation in the rock bed. <br /> D. Final inspection to verify proper final cover depths and to verify that all pump stations <br /> (where required) components are functional and comply with codes. <br /> 5. Individual holding N1PCAInstallers License shall be present during all inspections. A24-hour <br /> notice is required for all inspections. <br />