Laserfiche WebLink
#17-3911 3245 Wayzata Blvd. <br /> March 20,2017 <br /> Page 3 <br /> • A minimum separation distance from nearby residential structures or lot lines <br /> • Minimum lot size <br /> • Requirements for site and adjacent road maintenance, and traffic control measures <br /> • Allowed only for government sponsored public improvement projects <br /> • The Council must have the ability to deny an interim use even though it is listed <br /> for a specific zoning district. Item 4 of the statute excerpt would presumably <br /> allow the City to find that appropriate conditions cannot or will not be met, and <br /> that becomes a basis for denial. <br /> Planning Commission should consider whether there are any additional conditions that would <br /> be appropriate for this use. <br /> Comprehensive Plan Considerations <br /> An interim use that might be appropriate on a temporary basis might not fit within the type of uses <br /> for which a property is guided in the Comprehensive Plan. So, if an interim industrial-type use is <br /> allowed in the zoning code as an interim use in an area guided for residential use, does that meet <br /> the standard for being 'in conformity with the Comp Plan'? The City Attorney has indicated that <br /> because zoning needs to be consistent with the Comp Plan, the Comp Plan technically should be <br /> amended to allow interim uses that aren't conforming to the CMP guiding. This requires further <br /> research by staff; potentially some text would be appropriately added to the Comp Plan during its <br /> update due in 2018. That should not impact the ability to add Interim Uses to the zoning code <br /> now. <br /> Public Comments <br /> No comments for or against the proposal have been received to date. Notification to all properties <br /> within 350 feet of the property was mailed out 10 days prior to this public hearing. <br /> Issues for Consideration <br /> 1. Does the Planning Commission conclude that the adoption of an Interim Use ordinance <br /> would be a beneficial tool? <br /> 2. If so, does the Planning Commission find that the proposed construction staging use <br /> on an interim basis is appropriate in the RR-1B (2-acre Single-Family Rural <br /> Residential) Zoning District? What specific conditions are necessary to ensure that a <br /> given property is appropriate for that use? Consider the bulleted criteria above and <br /> attempt to put some numerical standards in place that would limit the use to only <br /> certain locations under certain conditions (as opposed to merely establishing and <br /> imposing conditions on a site specific basis,which could be considered as arbitrary...). <br /> 3. Given the three examples from other cities, does Planning Commission have a <br /> preference among them as a template to follow for the general Interim Use text? A <br /> draft text amendment will be forthcoming. <br /> 4. Are there any other issues or concerns with this application? <br /> Staff Recommendation <br /> Staff recommends that an Interim Use section be added to the zoning code and that the RR-1B <br /> District be amended to include a list of allowed Interim Uses to include "Construction staging, <br /> materials and equipment storage and materials recycling" under specific conditions. <br />