My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-20-2017 Planning Commission Packet
Orono
>
Planning Commission
>
2017
>
03-20-2017 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 1:46:52 PM
Creation date
2/5/2018 1:45:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
370
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FILE#17-3920 <br /> March 20,2017 <br /> Page 2 of 2 <br /> Section 3 of the draft proposes changes to the site plan review process for permitted uses in <br /> commercial and industrial districts. The City administrator or designee (recent goals of <br /> identifying the City Administrator as the title of the individual in charge of implementing the city <br /> continue) is to make decisions on site plans, but may refer these to the city council. The change: <br /> staff reviews permitted and accessory uses,and a public hearing is not required. <br /> Section 4 removes much of what is required for a site plan application, deferring this to forms <br /> provided by the city. This allows for more flexibility to change the form, or to waive <br /> requirements when appropriate based on the project. <br /> Section 5 requires a building permit(which in turns requires a site plan), and that the property <br /> corners must be located. This deviates from the current ordinance,which requires pins to be <br /> located. If pins are not located,the property must be resurveyed. <br /> Section 6 continues to require a location for a 20 x 24 foot garage shown on a plan,the change <br /> is the type of the plan, based on if the garage is to be connected to the principal structure or <br /> not. <br /> Engineer Comments <br /> The city engineer and planning staff are reviewing the site plan/certified site plan requirements <br /> Public Comments <br /> To date, no public comments have been received. <br /> Issues for Consideration <br /> 1. Does the draft ordinance accomplish the goals? <br /> 2. Are there any other issues or concerns with this proposal? <br /> List of Exhibits <br /> Exhibit A. Draft Ordinance <br /> Exhibit B. Applicable sections of the city code <br />
The URL can be used to link to this page
Your browser does not support the video tag.