Laserfiche WebLink
#17-3910 3245 Wayzata Blvd. <br /> March 20,2017 <br /> Page 4 <br /> 5, Construction of a proposed permanent screening berm along the south and southwesterly <br /> boundaries of the site will require conditional use permit application and approval. <br /> 6. An annual review of the interim use permit shall be conducted to determine whether the use <br /> remains acceptable during the duration of the Wayzata Boulevard improvement project. <br /> 7. Any other conditions that Planning Commission and Council determine should be included. <br />