Laserfiche WebLink
PUD NO.2C AGREEMENT AND <br /> DEVELOPMENT CONTRACT <br /> { <br /> EXSIBIT A-SITE I PROVEMENTS COST ESTIMATE <br /> r ' <br /> 7 <br /> Amber Woods Office Center Plat 074250 <br /> Cost Estimate for Financial Guarantee(150%) <br /> !Wavy Sewer Improvements Unite Qty VUnit Total <br /> Moon LS 1 3 5,000.00 $5,000.00 <br /> Traffic Control LS 1 5 1,000.00 11,000.00 <br /> Conned to ExW ing 8"Sanitary Sewer EA 1 $ 2,500.00 $2,500.00 <br /> 8"PVC Sanitary Sewer LF 380 $ 30.00 $10,800.00 <br /> 8"X8"Wye EA 5 $ 100.00 $600.00 <br /> 4'Diameter Sanitary Sewer Manhole <br /> EA 4 1 2,000.00 $8,000.00 <br /> 4'Diameter Santry Sewer Manhole Overdepth LF 22 $ 100.00 52,200.00 <br /> improved Pipe Foundation LF 400 $ 1.00 1400.00 <br /> Estimated-Construction Cost $30,400.00 <br /> Water Main Im•rovements Units Qty $IUnit Total <br /> Remove Existing Watermalrl Pipe LF ' 200 3 6.00 ,$1,200.00 <br /> 'Remove Hydrant EA 2 $ 500.00 $1,200.00. <br /> Corned to Existing Wader MaWn EA 2 $ 2,500,00 $5,000.00 <br /> 8`DIP Water Main LF 780 $ 40.00 $30,400.00 <br /> 8•DEP Water Main LF 95 $ 30.00 $2,550.00 <br /> 8"Fittings EA 15 $ 250.00 53,75040 <br /> insulation SY 10 $ 10.00 1100.00 <br /> Hyp EA 3 $ 2,600,00 $7,300.00 <br /> 8"Gv and Box EA 2 $ 1,300.00 $2,800.00 <br /> 8"Gv and Box • EA 3 $ 1,200.00 13,900.00 <br /> Estimated Construction Cast $57,900.00 <br /> Services Improvements Unite Qty $lUnit Total <br /> 8"PVC,Service Pipe LF 355 $ 22.00 $7,810.00 <br /> 1.5 inch capper sends LF 305 $ 18.00 54,880.00 <br /> 1.6 inch oorp WA 5 $ 200.00 51,000.00 <br /> 1.5 Inch curb stop EA 5 $ 250.00 51,250.00 <br /> Estimated Construction Cost $14,940.00 <br /> I— f <br />