Laserfiche WebLink
F. No site work or construction shall commence until the Developer has paid the Storm <br /> Water and Drainage Trunk Fee as established in Concept Plan Resolution 5585. The <br /> MCES Sewer Availability Charges(SAC)are the responsibility of the Developer and <br /> shall be paid to the City at the time of building permit issuance for pass-through to <br /> MCES. <br /> G. The Developer shall be responsible far obtaining the necessary permits from the <br /> regulatory agencies such as the Minnesota Department of Health,MCES,Minnehaha <br /> Creek Watershed District,Minnesota DNR,MPCA,and MnDOT. <br /> H. The Developer shall report to the City Engineer the location of any drain tiles found <br /> during construction. The Developer will comply with the City Engineer's direction <br /> as far as abandonment or relocation of the drain tile. <br /> I. The Developer shall provide the City with a detailed haul route for review and <br /> approval for all material imported or exported from the Property. If the material is to <br /> be imported or exported to/from another site in Orono, it should be noted that those <br /> other parcels will be required to obtain a land alteration permit, and potentially a <br /> conditional use permit from the City. <br /> J. The Developer shall obtain a temporary construction easement from and establish <br /> permanent maintenance agreements with the owner of the property directly west at <br /> 2120 Wayzata Boulevard for construction and maintenance of the necessary retaining <br /> walls. <br /> 12. General Conditions. The general conditions of this Agreement are documented in City <br /> Council Resolution No.;S613 adopted by the City Council on May 14,2007,which is <br /> incorporated herein by reference. Additional conditions of approval are attached hereto <br /> as Exhibit B. <br /> Developer Initial <br /> City Clerk Initial. <br /> Page 7 of 9 <br /> 4 � <br />