Laserfiche WebLink
Fees to be Charged " YES NO <br /> Permit, <br /> Plan Review (/ <br /> State Surcharge r <br /> Investigation Fee <br /> Ww..k.° !.Z <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1St Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> Estimated Construction Value: $ DO 67 <br /> Orono Inspections Required Work Requiring Separate Permits <br /> ❑ Footing 0 Site elEC,Plumbing 0 Grading/Filling <br /> ❑ Poured Wall 0 Silt Fence/Erosion Control g Mechanical 0 Fire <br /> ❑ Foundation Survey 0 Hardcover Removal 0 Fireplace 0 Water Connection <br /> O Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> O Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> ❑ Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> )3( Insulation <br /> 0 As-Built Survey <br /> Final <br /> ❑ Lathe Required State Permits <br /> ❑ Other(specify) <br /> ❑ Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> ❑ See Builder Acknowledgement Form <br /> ❑ Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />