My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
info on exterior insulation/filling material, etc.-1999
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
4753 North Shore Drive - 07-117-23-32-0020
>
Misc
>
info on exterior insulation/filling material, etc.-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:35:07 PM
Creation date
1/31/2018 3:38:49 PM
Metadata
Fields
Template:
x Address Old
House Number
4753
Street Name
North Shore
Street Type
Drive
Address
4753 North Shore Dr
Document Type
Misc
PIN
0711723320020
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EPS Geofoam 2001,3rd International Conference, Salt Lake City,December 2001 11 <br /> the fills with EPS blocks and supporting new bridge abutments directly on the EPS.The repair design is indicated in <br /> figure 19. <br /> 20 cm apron 10 cm.concrete <br /> slab <br /> aK <br /> it <br /> Figure 19.Supporting bridge abutments directly on EPS,Hjelmungen bridge,Norway <br /> Repair works were initiated in December 1995 and completed in the spring of 1996.One abutment was treated at a <br /> time while the bridge deck was provided with a temporary support as shown in figure 20.Thickness and densities of <br /> the original filling materials were recorded as they were removed in order to have accurate data for control of load <br /> and settlement calculations.After removing the old abutments,the concrete piles were inspected regarding possible <br /> damage before being cut at ground level.No pile damage was observed.Construction of the EPS fills could then <br /> start.In this case three different qualities of EPS were utilized.In the zone directly beneath the bridge abutment,as <br /> indicated by the trapezoidal shaped lines in figure 19,a material quality of 6=235 kPa was specified for the first <br /> three block layers beneath the bottom slab of the abutment.Further down a material <br /> quality of a=180 kPa was <br /> 77 <br /> i <br /> a> <br /> k3 u <br /> Figure 20.Temporary support of abutments at Hjelmungen <br /> specified within the indicated zone.For the rest of the EPS fill a material quality of 6=100 kPa was used.These <br /> quality requirements have been decided based on evaluation of stress distribution in the material in order to keep the <br /> stress level for dead loads within 30%of the material strength.Stricter geometric requirements than normal were <br /> also enforced related to block dimensions in order to obtain an even fill and reduce initial deformations when the <br /> load from the bridge deck was transferred to the new abutment. <br /> Behind both abutments a 10 m long and 200 mm thick concrete apron was specified to be cast above the EPS fill as <br /> a friction plate in order to take up horizontal forces on the abutment.On the rest of the EPS fill a concrete slab of 100 <br /> Long term performance and durability of EPS as a lightweight filling material <br />
The URL can be used to link to this page
Your browser does not support the video tag.