Laserfiche WebLink
MW <br /> Mr. Herman Crawford <br /> August 17, 1998 <br /> Page 2 <br /> e. Entrance door, balcony and stairs on north side of house (supposedly a <br /> scaffold for fixing roof overhang). <br /> f. Remodeling of main floor of north half of house. <br /> g. All plumbing,electrical and mechanical work. <br /> To get this project moving and prevent further damage, the City suggests the following order of <br /> events: <br /> 1. Allow the Crawfords to continue living in the house. They have lived in the house <br /> throughout the remodeling and there is no more hazard now than during other <br /> construction. <br /> 2. Reframe and shingle the roof which blew away if the structural engineer finds that <br /> framing of lake side addition can be corrected to support this roof. This roof must <br /> be built according to 1976 plans but meet current Building and Energy Codes. <br /> 3. Proceed with approval and inspection of items listed above. All work which has not <br /> been previously approved must meet not only current Building Codes but current <br /> Zoning Codes for the City of Orono as well. <br /> I hope this letter serves as a starting point for discussion. Please call me to discuss questions and <br /> comments. The City will be as flexible as we can to get the house back to water tight. However, <br /> this project is in dire need of direction and must meet all current standards before any other permits <br /> will be issued. <br /> Sinc ely, <br /> efw <br /> Bruce L. Vang <br /> Building Inspector <br /> BLV/ch <br /> cc: Greg Gappa, Public Services Director <br /> Elizabeth Van Zomeren, City Planner/Zoning Administrator <br /> J. H. Dahlmeier Engineering,2434 Commerce Blvd., <br /> Mound,MN 55364 <br />