Christine Mattson . <br /> From: Melanie Curtis <br /> Sent: Tuesday, November 12, 2013 11:38 AM <br /> To: 'Rodney Colson' <br /> Cc: Christine Mattson; 'Brian McCullough'; Jesse Struve; 'louis@colsoncustomhomes.com' <br /> Subject: RE: 20131108 as-built review 4731 North Shore Dr <br /> Rodney <br /> The Certificate of Occupancy can be issued for the new home permit if the issues identified by Jesse (highlighted below). <br /> We will begin that process once we can confirm. I will stop out at the site later today to check. <br /> However, based on the proposed permit plans for the walls, Jesse's review of the site and the as-built surveyed contours <br /> I need your surveyor to calculate the total amount of earth movement. It appears that there were changes made to the <br /> plan to accommodate a pathway (vs. stairs) and the associated slope grading was not shown on the proposed plan. We <br /> need this broken down into total earth movement (including wall work) and the total for the grade changes and finish <br /> grading within the 75' setback. <br /> We will hold the escrow until the permit for the work in the 75'setback is resolved. As you are aware, and as we <br /> discussed numerous times, I can only administratively approve 10 cubic yards of earth movement within the 75' setback. <br /> If the grading done to accommodate the pathway exceeds 10 cubic yards an after-the-fact CUP will be necessary. <br /> Melanie <br /> Melanie Curtis W 952.249.4627 E mcurtis@ci.orono.mn.us <br /> From: Jesse Struve <br /> Sent: Friday, November 08, 2013 11:54 AM <br /> To: 'Rodney Colson' <br /> Cc: Christine Mattson; Melanie Curtis <br /> Subject: 20131108 as-built review 4731 North Shore Dr <br /> Rodney, <br /> I was out at the site this morning, and there is one issue which needs to be addressed prior to me signing off on the as- <br /> built review. There are areas on the City ROW which was disturbed but nothing was ever reestablished. These areas will <br /> need to be racked, smoothed out, topsoil applied, and seed and blanket installed (see photos). <br /> I do have some questions for Melanie about the walking path which was graded in. The intent of the walls was to <br /> replace existing walls and not to allow for grading to have taken place. I understand why you cut in the path in was to <br /> get materials down the hill for the walls but the permit was to replace the walls "in kind". <br /> Since you did not get a CUP you would have been required to grade this trail back to the original slope after the walls <br /> were completed, but it appears you kept it and stabilized it. I think you should schedule a meeting with Melanie to <br /> discuss this matter on Tuesday. She is gone today, and the office is closed on Tuesday. <br /> If you get the ground in question stabilized with seed and erosion control blanket and as long as you get my question <br /> resolved with Melanie, I can sign off on this on Tuesday. <br /> Jesse Struve, PE <br /> Director of Public Works/City Engineer <br /> City of Orono <br /> (952) 249-4661 - Direct <br /> (952) 249-4616 - Fax <br /> 1 <br />