Laserfiche WebLink
FA <br /> H A u G ® Version 4-5-09 <br /> Daily Soil Observation Notes <br /> Project No: 13-185 Date:4-16-13 <br /> Project Name:4135 North shore dr Project Location: Orono,MN <br /> Client:Colson Custom Homes Temp/Weather:35 clear <br /> Project Manager:Haugo Time Arrived: Departed: <br /> Areas Observed: []Building Pad ®House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes NNo Report reviewed? ❑Yes NNo Report prepared by: <br /> Benchmark: Benchmark evaluation: Benchmark provided by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? N Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? ❑NA N Yes ❑No Soils observed agree with Soils report? ❑Yes [-]No <br /> Soils appear adequate for design loads? NYes ❑No Proposed project bearing capacity(psf):2000 <br /> Contractor notified of results? NYes ❑No Name of person notifled:Ben <br /> Was a copy of this report left on site? ❑Yes N No If so,whom was it submitted to? <br /> Notes/Comments:Observed excavation for above house. Excavation bottom soils consist of naturally occuring clay till <br /> soils.The walkout footing will on natural soils,except where a cistern was located on the west side of the basement and <br /> removed. Imported silty sand will be used as backfill.Bottom soils approved for fill placement <br /> Performed By:Paul Haugo Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed In the final report may vary from,and shall take precedence over,those indicated In a preliminary report. <br />