My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
soil observation notes
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
4731 North Shore Drive - 07-117-23-32-0067
>
Misc
>
soil observation notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:36:17 PM
Creation date
1/31/2018 1:43:05 PM
Metadata
Fields
Template:
x Address Old
House Number
4731
Street Name
North Shore
Street Type
Drive
Address
4731 North Shore Dr
Document Type
Misc
PIN
0711723320067
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FA <br /> H A u G ® Version 4-5-09 <br /> Daily Soil Observation Notes <br /> Project No: 13-185 Date:4-16-13 <br /> Project Name:4135 North shore dr Project Location: Orono,MN <br /> Client:Colson Custom Homes Temp/Weather:35 clear <br /> Project Manager:Haugo Time Arrived: Departed: <br /> Areas Observed: []Building Pad ®House Pad ❑Roadway ❑Parking/Walks ❑ Footing <br /> ❑Proof Roll ❑Other(describe): <br /> Soil report available? ❑ Yes NNo Report reviewed? ❑Yes NNo Report prepared by: <br /> Benchmark: Benchmark evaluation: Benchmark provided by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? N Yes ❑No Specified compaction: Fill source: <br /> Oversizing appears adequate? ❑NA N Yes ❑No Soils observed agree with Soils report? ❑Yes [-]No <br /> Soils appear adequate for design loads? NYes ❑No Proposed project bearing capacity(psf):2000 <br /> Contractor notified of results? NYes ❑No Name of person notifled:Ben <br /> Was a copy of this report left on site? ❑Yes N No If so,whom was it submitted to? <br /> Notes/Comments:Observed excavation for above house. Excavation bottom soils consist of naturally occuring clay till <br /> soils.The walkout footing will on natural soils,except where a cistern was located on the west side of the basement and <br /> removed. Imported silty sand will be used as backfill.Bottom soils approved for fill placement <br /> Performed By:Paul Haugo Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed In the final report may vary from,and shall take precedence over,those indicated In a preliminary report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.