Laserfiche WebLink
Stephen &Joanie Ward <br /> 4695 North Shore Drive <br /> Mound, Minnesota 55364 <br /> 612-472-1879 <br /> 30 March 1992 <br /> General Material and Construction Specifications. <br /> Proposed Garage and Room Addition and_Interior_Remodeling to existing House at <br /> 4695 North Shore Drive, Orono, MN. <br /> See Construction Drawings FP-1 (Revised 03/30/92), FP-2, (Rev. 03/30/92), <br /> FP-3, (Rev. 03/30/92), E-1, (Rev. 03/30/91) & S 1 (Engineered Masonry and Steel) <br /> General Scope of Work <br /> L Addition <br /> Owner intends to build a 23'x 35'Four level Garage/Room Addition attached <br /> to an existing walkout home. <br /> The addition will have four levels: <br /> 1. Full Unfinished Basement. <br /> 2. First Floor Family Room and separate Bedroom. <br /> 3. Heated 2-1/2 Car Garage with Workshop and Built-In Storage Shelves. <br /> 4. Master Bedroom Suite with Sun Deck, Master Bath. <br /> Note: All four levels are accessed with a finished open stair system. <br /> 11. Interior Remodeling <br /> A. Lower Walk-out Level <br /> 1. Finish existing Roughed-In 3/4 Bath. <br /> 2. Remove existing stairs to First Floor and enlarge existing Laundry Room. <br /> B. First Floor Level <br /> 1. Remove existing stairs to Lower Level and extend existing flooring to creat <br /> eating area off kitchen. <br /> 2. Remove existing built-in seating area and extend kitchen worktop. <br /> 3. Remove existing entry way and closet. Install new walk-in Entry Closet and <br /> creat new access to Bedroom and First Floor Full Bath. <br /> 1. Addition <br /> A. Excavation <br /> 1. Excavate as needed for full basement. Relocate approx. 100 cu. yds of excavated <br /> dirt to lakeside yard. Haul excess dirt off site. <br /> B. Masonry, Flat Work & Drain Tile, <br /> 1. Tle new concrete footings Into existing house concrete footing system. <br /> 2. Install a two-story 160 concrete block foundation system reinforced with steel& <br /> bond beams as required. - See Structural Sheet. <br /> 3. Pour concrete basement slab. <br /> 4. Install prestressed concrete Garage Floor and First Bloor with concrete top coat. <br /> 5. Install perimeter footing drain the with Interior sump collection basket and pump. <br /> 6. Install waterproofing mastic on exterior of below grade masonry. <br /> C. Framing <br /> 1. Wall Assembly- 2x6, R-19 Insulation, Interior drywall, 35/32 exterior sheathing for <br /> wood siding or concrete board for stucco siding. <br /> 2. Floor Assembly-2x8, 3/4" T& G decking. <br /> 3. Roof Assembly- 2X72, R-38 Insulation, Interior drywall vaulted ceilings, standard <br /> 3-tab shingles. <br />