My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01358 - new structutre
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
4680 North Shore Drive - 07-117-23-32-0050
>
Permits/Inspections
>
2014-01358 - new structutre
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:35:40 PM
Creation date
1/30/2018 12:38:08 PM
Metadata
Fields
Template:
x Address Old
House Number
4680
Street Name
North Shore
Street Type
Drive
Address
4680 North Shore Dr
Document Type
Permits/Inspections
PIN
0711723320050
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Christine Mattson <br /> From: Robert Bean [bobbe@bolton-menk.com] <br /> Sent: Tuesday, December 02, 2014 2:09 PM <br /> To: Christine Mattson <br /> Cc: Andrew Mack; Adam Edwards; Melanie Curtis; David P. Martini; Brian Simmons <br /> Subject: 2014-01358 -4680 North Shore Drive <br /> Christine, <br /> I have completed review of the Building Permit application package for 4680 North Shore Drive. Following are my <br /> comments for City consideration: <br /> 1. The silt fence location should be indicated on the plan immediately down gradient from all proposed work(keep <br /> within property limits adjacent to public right-of-way). The silt fence should be installed and inspected by the <br /> City prior to any land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to <br /> inspection. <br /> 2. The grading should be revised on the north, east, and west side of the proposed house to increase slopes. A <br /> minimum slope of 1% is recommended for paved areas, and a minimum 2%slope is recommend for green <br /> areas. The contours along the east side may also need to be revised as necessary to indicate a swale is to be <br /> provided. <br /> 3. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering oversight. <br /> The financial security is intended to provide protection in the event that it becomes necessary for the City to <br /> install or maintain erosion and sediment control within the project area and covers the cost of vegetation re- <br /> establishment if the applicant is unable to follow through with the conditions of approval. <br /> 4. The applicant may be required to obtain Minnehaha Creek Watershed District(MCWD) approval and permitting <br /> for their Erosion Control rule. A copy of any approved permit or confirmation that no permit is required should <br /> be submitted prior to any land altering activities. <br /> If you have any questions or comments, please contact me to discuss. <br /> Thanks, <br /> Robert E. Bean,Jr, P.E. <br /> LEED Green Assoc. <br /> Water Resources Engineer <br /> Bolton & Menk, Inc. <br /> Consulting Engineers&Surveyors <br /> 2638 Shadow Lane, Suite 200 <br /> Chaska, MN 55318 <br /> P:(952)448-8838, ext 2892 <br /> F:(952)448-8805 <br /> email: bobbe@bolton-menk.com <br /> www.bolton-menk.com <br /> This email has been scanned by the Symantec Email Security.cloud service. <br /> For more information please visit http://www.syManteccloud.com <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.