Laserfiche WebLink
Page 2 January 19, 2018 <br /> Review of Void in Concrete <br /> 3955 Cherry Avenue, Orono, MN <br /> For Schaper Engineering, LLC <br /> Recommendations <br /> The following steps to be completed in chronological order: <br /> 1. Hammer drill a 9/16" hole (take care to ensure the proper location and that the hole is plumb) <br /> into existing foundation to receive anchor bolt. <br /> 2. Install (1) Hilti HAS-R 1/2"x 12" SS316 Anchor bolt into existing foundation with Hilti ADH <br /> RE 500-V3 Epoxy. <br /> 3. Set post base at proper location and brace. <br /> 4. Pour Sonneborn Masterflow 928 Grout to fill existing void in concrete. <br /> 5. Allow grout to cure for 24 hours. <br /> 6. Install post as described in truss repair dated 1.9.2018. <br /> Conclusions <br /> The repair issued will provide adequate bearing and shear conditions for new post. <br /> `,,lli '' <br /> `�� PM A.B`CL,e,� I HEREBY CERTIFY THAT THIS PLAN, <br /> ,�• ��''••........ <br /> SPECIFICATION,OR REPORT WAS PREPARED BY ME <br /> �:•. LICENSED .2' OR UNDER MY DIRECT SUPERVISION AND THAT I <br /> e PROFESSIONAL. _ <br /> - ENGINEER - AM A DULY REGISTERED PROFESSIONAL <br /> (D 18494 r1/5".:7' ENGINEER UNDER THE LAWS OF THE STATE OF <br /> 9• ),'•. , . MINNESOTA. <br /> e,'10,110'P MIS 0%`' <br /> t Jit- <br /> ger-t aP-iff-PeDifr <br /> WILLIAM A.BECKLIN,P.E. <br /> DATE:JANUARY 19,2018 LIC.No. 18494 <br />