Laserfiche WebLink
r <br /> Page 2 January 19, 2018 <br /> Review of Void in Concrete <br /> 3955 Cherry Avenue, Orono, MN <br /> For Schaper Engineering, LLC <br /> Recommendations <br /> The following steps to be completed in chronological order: <br /> 1. Hammer drill a 9/16" hole (take care to ensure the proper location and that the hole is plumb) <br /> into existing foundation to receive anchor bolt. <br /> 2. Install (1) Hilti HAS-R 1/2"x 12" SS316 Anchor bolt into existing foundation with Hilti ADH <br /> RE 500-V3 Epoxy. <br /> 3. Set post base at proper location and brace. <br /> 4. Pour Sonneborn Masterflow 928 Grout to fill existing void in concrete. <br /> 5. Allow grout to cure for 24 hours. <br /> 6. Install post as described in truss repair dated 1.9.2018. <br /> Conclusions <br /> The repair issued will provide adequate bearing and shear conditions for new post. <br /> 0 4.0 A-.13. 0 I HEREBY CERTIFY THAT THIS PLAN, <br /> 0............ <br /> SPECIFICATION,OR REPORT WAS PREPARED BY ME <br /> : LICENSED ••'• ' OR UNDER MY DIRECT SUPERVISION AND THAT? <br /> c PROFESSIONAL <br /> ENGINEER AM A DULY REGISTERED PROFESSIONAL <br /> cs 18494 : `., ENGINEER UNDER THE LAWS OF THE STATE OF <br /> '9)'•. ;: O; MINNESOTA. <br /> WILLIAM A.BECKLIN,P.E. <br /> DATE:JANUARY 19,2018 1it.No. 18494 <br />