My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01665 - new structure
Orono
>
Property Files
>
Street Address
>
B
>
Boulder Drive
>
765 Boulder Drive - PID: 33-118-23-11-0134 - New PID
>
Permits/Insepctions
>
2017-01665 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:45:09 PM
Creation date
1/29/2018 3:31:19 PM
Metadata
Fields
Template:
x Address Old
House Number
765
Street Name
Boulder
Street Type
Drive
Address
765 Boulder Drive
PIN
3311823110134
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees to be Charged . - YES NO <br /> �. f <br /> Permit . z; t.t, -.� :- . ,r <br /> Plan Review f/ ' <br /> State Surcharge ... ,,.i'l . _. <br /> w <br /> Investigation Fee <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage / /X / _ $ <br /> !?�U,(YM <br /> Estimated Construction Value: $ O <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing 1:1 Site ,g.Plumbing ❑ Grading/Filling <br /> Poured Wall Silt Fence/Erosion Control Mechanical 0 Fire <br /> Foundation Survey 0 ardcover Removal Fireplace .Water Connection <br /> 0 Framing 0 Other(specify) 0 Masonry Sewer Connection <br /> Waterproofing/Drain tile "(Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> Insulation <br /> As-Built Survey <br /> Final <br /> *Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.