My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: report on drainage analysis
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
4510 North Shore Drive- 07-117-23-31-0029
>
Correspondence
>
Re: report on drainage analysis
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:34:35 PM
Creation date
1/29/2018 1:14:29 PM
Metadata
Fields
Template:
x Address Old
House Number
4510
Street Name
North Shore
Street Type
Drive
Address
4510 North Shore Dr
Document Type
Correspondence
PIN
0711723310029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 07 '97 14:02 FWTTKE ENGINEERING, INC. 61 30300 TO: Pod <br /> City and county. ThuS the present drainage Syste�a is <br /> insufficient by engineering standards, <br /> It should 4160 be holed, that with the erosion potential of the <br /> moil in this area, special care Should be taken to prevent <br /> erosion. At present, the ditch leading to the culvert is deep <br /> with eroded material depaaited in the last several montna, Abd <br /> the culvert is nearly blooked: The present potential for water <br /> denago to the Sawicki home is actua17:p much higher than stated in <br /> the calculations above, as these calculations were based upon a <br /> fully functioning culvert. Additionally,, as this loose eroded <br /> zaterial is carried downstream through the culvert and on, it <br /> will deposit in the yards of both homes. Consequently it is <br /> expected that you both will Suffer damages from deposition even <br /> Without a 4 inch rainfall. <br /> In spry, increased runoff fro* the homes on Tonkaview resulted <br /> in increased stage (water elevation) at the culvert under tete <br /> Sawicki driveway, to the point that it overflowed, ran down the <br /> driveways, and resulted in damages. With the modifications <br /> recently malas to the drainage system, the bassesen house is <br /> probably protected from CR 19 water, hQweyar the Sawicki home is <br /> in (jreater peril. without Modifications to the present system, <br /> the next 4$ inch rainfall muid result in more extensive damage <br /> to the Sawicki home than in 1995. <br /> If you have any questions, please give me a call. I will be <br /> eivailsab16 to evaluate any proposed correction of the problem by <br /> the city and/or county las your representative), and to <br /> participate in litigation, should that be necessary. If <br /> liticlation is necessary, we will prepare some fancy charts and <br /> drRvIngs to illustrate the "whys and whereforesh. <br /> I hereby certify that thib report was prepared by me or under my <br /> diva—c—t 6upervirion, and that I am a duly Registered Profeimional <br /> Engineer uftder the State of Minnesota statutes, Sections 326.02-- <br /> 336.16. <br /> Tedd W. Mattke, Ph.D. , p.E. <br /> xx PE #13612 <br />
The URL can be used to link to this page
Your browser does not support the video tag.