Laserfiche WebLink
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> �� ,r Gam` id786 <br /> AkFSHo�� N O. <br /> their expected responsibility to design and construct a private trail. (example: if <br /> the private trail is to cost$100,000, and Hennepin County requests city funding of <br /> $200,000 for a public trail,the developer will provide $100,000.) <br /> 20. 10% Private Park RPUD Requirement. The private recreation area of'10% of <br /> the platted property' required under the RPUD standards will be satisfied via the <br /> pavilion and the reflective spaces in front of the building, and upper level patio <br /> areas. <br /> 21. Park and Trail Dedication. There are no identifiable public parkland needs at this <br /> location. The Stonebay master plan identified park dedication needs for residential <br /> development because development of the proposed housing will generate <br /> additional use of existing City park facilities in the area. The Council fmds that no <br /> park lands need to be dedicated and the park dedication should be in the form of a <br /> Cash Contribution in Lieu of Lands as allowed by the Municipal Code and as <br /> stipulated by the StoneBay Planned Unit Development Agreement. <br /> 3,250 per unit= $3,250 x 70=$227,500.00 <br /> 22. Stormwater Management. Stormwater management is proposed to be provided <br /> by the existing stormwater pond area east of the site. The stormwater facilities <br /> will be subject to standard drainage easements.In addition to the City of Orono,the <br /> Minnehaha Creek Watershed District have approval authority over the applicants' <br /> stormwater management plan. Final stormwater plans will be subject to the <br /> recommendations and approval of the City Engineer. <br /> 23. Stormwater and Drainage Improvements &Fees. The property will be subject <br /> to the Stormwater and Drainage Trunk Fee. Recent Council action to revise the <br /> Trunk Fee provisions would result in a fee (for development at greater than 4.0 <br /> units per acre) of $8,490 per acre (2017 Fee Schedule), based on non-wetland <br /> acreage. The fee is estimated at$29,715 ($8,490/ac x 3.5 acres= $29,715.00) <br /> 24. The applicant has provided General Concept Plans and Preliminary Plat Drawings <br /> attached to this Resolution as Exhibits A-1 through A-17 including: <br /> Plans prepared by Westwood Professional Services: <br /> Al - Plan Sheet 1 of 10—Cover Sheet dated 6-19-17 <br /> A2 - Plan Sheet 2 of 10— Survey dated 6-19-17 <br /> A3 -Plan Sheet 3 of 10— Site Plan dated 6-19-17 <br /> A4 - Plan Sheet 5 of 10—Grading Plan dated 076-19-17 <br /> Page 8 <br />