Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Home HHC Inc hhc@hhcadditions.com 0�5'"Fys <br /> Addition 11100 West River Road, Champlin MN 55316 W <br /> Everts P m BBB <br /> MN General Contractor #BC452069 <br /> MHC a rue Service rernodelirlg ControCt« <br /> �1(G7'/ <br /> urtt( .efq try' pia Rcvir�med dor Code <br /> Job Location: ',/ // Compliance C ty of Orono <br /> Libby Detor !�V it doll/`f S��'I fL�P�`rlf / Z 4� <br /> 1065 Ferndale Rd W X88 �` <br /> Wayzata, MN 55391 Reviewer A i, l `/ <br /> Scope of Work <br /> 1) Rot damaged header was discovered during window installation dictated by"Renewal by Andersen" <br /> 2) It was determined that the source of the water infiltration that damaged the header was the lack to flashing <br /> over top of 2 metal vents protruding through the brick veneer above the windows. <br /> 3) Rot to be repaired includes, but not limited to; <br /> a. Window header <br /> b. Exterior sheathing <br /> 4) Install temporary interior bracing to support floor load during repair <br /> 5) Cut out drywall as required to expose framing <br /> a. Cut 2"below ceiling line(allows for drywall finishing not to disrupt ceiling) <br /> 6) Remove and replace all damaged framing listed above. <br /> a. Build framing unit with sheathing attached and covered with ice and water shield for moisture barrier <br /> b. Attach to existing framing <br /> c. Drill through sheathing in to brick, Epoxy anchor bolts in brick to replace brick ties <br /> d. Fasten bolts to sheathing snug, but not tight,to allow movement and support to brick veneer <br /> e. Insulate with new as required, Install header <br /> f. New header to be double 9.5"LVL engineered lumber continuous span over all 3 windows <br /> i. Note—header has structural post between window units <br /> 7) Sheetrock interior wall <br /> a. Sheet rock to be taped and sanded to a paintable finish <br /> i. No interior priming or painting is included <br /> 8) "Renewal by Andersen "to install windows under a separate permit <br /> 9) Install flashing over the two metal vents <br /> a. Cut out the mortar joint at the top of the vents <br /> b. Insert custom flashing in joint and seal with mortar repair caulking <br /> HHC Inc MN Contractor license #BC452069 Page 1 of 1 11/27/2017 <br />