My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00492 - ROW permit
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
701 Dickey Lake Drive - 34-118-23-22-0005
>
Permits/Inspections
>
2017-00492 - ROW permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:04 PM
Creation date
1/19/2018 12:19:50 PM
Metadata
Fields
Template:
x Address Old
House Number
701
Street Name
Dickey Lake
Street Type
Drive
Address
701 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. CONTRACT DRAWINGS <br /> 4.1 The CONTRACT DRAWINGS or PLANS on which the Proposal and CONTRACT are <br /> based, consists of 29 sheets. These sheets bear the general title: Ringerwood L1 B2, <br /> Gonyea Homes, Inc. The sheets are specifically identified as: <br /> Sheet No. Description <br /> 1-2 Sanitary Sewer and Watermain Plans <br /> 5. BIDDING <br /> 5.1 Section I — Site Grading — may be completed under a separate contract, bidders must <br /> specify if their bids are tied together. Section II — Utilities, and Section III - Streets will be <br /> awarded to one (1) successful bidder and will be completed under one (1) contract, for the on- <br /> site utility work. The OWNER may choose to remove one section of the contract or complete <br /> items under a separate contract. <br /> 6. CONSTRUCTION SCHEDULE & COMPLETION DATE <br /> 6.1 The projected construction start for Ringerwood L1 B2 is Spring 2017, after City Council <br /> approval. <br /> 6.2 The OWNER and CONTRACTOR shall determine and agree upon a construction <br /> schedule prior to signing of the contract. This schedule shall be used to determine the <br /> completion date for the work. <br /> 6.3 The Completion Date for all WORK will be set as follows: The completion date shall be <br /> established by adding the number of calendar days listed below to the date of issuance of the <br /> Notice to Proceed or to the date that WORK is started on the project, whichever comes first. <br /> All Utility Work- 10 Working Days <br /> Prior to signing of Contract Documents a meeting with all Contractors, the Owner and Engineer <br /> in attendance will be held to work out a detailed Construction Schedule and Completion Dates <br /> on this project. The above listed Working Days are approximate and final schedules will be <br /> determined at the above referenced meeting. All Street Work must be Completed By October <br /> 31, 2017 thru the bituminous base course. <br /> 6.4 No WORK shall be performed, nor shall any material or equipment be stored at the <br /> WORK site prior to receipt of the Notice to Proceed. <br /> 7. INSURANCE <br /> 7.1 Insurance requirements shall be in accordance with section GC 24 except as modified in <br /> 7.2 below: The Contractor shall obtain the stated minimum insurance coverage and maintain it <br /> at all times throughout the life of the Contract. <br /> SP-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.