My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00492 - ROW permit
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
701 Dickey Lake Drive - 34-118-23-22-0005
>
Permits/Inspections
>
2017-00492 - ROW permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:04 PM
Creation date
1/19/2018 12:19:50 PM
Metadata
Fields
Template:
x Address Old
House Number
701
Street Name
Dickey Lake
Street Type
Drive
Address
701 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14.19 The CONTRACTOR shall,take positive measures to maintain drainage and <br /> control construction borne sedimentation and erosion. This shall be accomplished by <br /> placement of siltation fencing and the construction of cutoff ditches,berms and debris <br /> basins and by other on-site protection. Any temporary ditching,culverts, and siltation <br /> fencing necessary to accomplish this end shall be at the CONTRACTOR'S expense <br /> unless a BID ITEM is provided for the WORK. <br /> 15. SUPERVISION BY CONTRACTOR <br /> 15.1 The CONTRACTOR will supervise and direct the WORK. He will be soley responsible <br /> for the means,methods,techniques,sequences and procedures of construction. The <br /> CONTRACTOR will employ and maintain on the WORK a qualified supervisor or <br /> superintendent who shall have been designated in writing by the CONTRACTOR as the <br /> CONTRACTOR'S representative at the site. The supervisor shall have full authority to <br /> act on behalf of the CONTRACTOR and all communications given to the supervisor <br /> shall be as binding as if given to the CONTRACTOR. The supervisor shall be present on <br /> the site at all times as required to perform adequate supervision and coordination of the <br /> work. <br /> 16. CHANGES IN THE WORK <br /> 16.1 The OWNER may at any time,as the need arises,order changes within the scope of the <br /> WORK without invalidating the Agreement. If such changes increase or decrease the <br /> amount due under the CONTRACT DOCUMENTS,or in the time required for <br /> performance of the WORK,and equitable adjustment shall be authorized by CHANGE <br /> ORDER. <br /> 16.2 The ENGINEER,also,may at any time,by issuing a FIELD ORDER, make changes in <br /> the details of the WORK. The CONTRACTOR shall proceed with the performance of <br /> any changes in the WORK so ordered by the ENGINEER unless the CONTRACTOR <br /> believes that such FIELD ORDER entitles him to a change in the CONTRACT PRICE or <br /> TIME,or both,in which event he shall give the ENGINEER WRITTEN NOTICE thereof <br /> within seven(7)days after the receipt of the ordered change. Thereafter the <br /> CONTRACTOR shall document the basis for the change in CONTRACT PRICE or <br /> TIME within thirty(30)days. The CONTRACTOR shall not execute such changes <br /> pending the receipt of an executed CHANGE ORDER or further instruction from the <br /> OWNER. <br /> 17. CHANGES IN CONTRACT PRICE <br /> 17.1 The CONTRACT PRICE may be changed only by a CHANGE ORDER. The value of <br /> any WORK covered by a CHANGE ORDER or of any claim for increase or decrease in <br /> the CONTRACT PRICE shall be determined by one or more of the following methods in <br /> the order of precedence listed below: <br /> (a) Unit prices previously approved. <br /> (b) An agreed lump sum. <br /> (c) The actual cost for labor,direct overhead,MATERIALS,supplies,and other <br /> services necessary to complete the WORK. In addition there shall be added an <br /> GC-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.