4.3 Any discrepancies found between the PLANS and SPECIFICATIONS and site <br /> conditions or any inconsistencies or ambiguities in the PLANS or SPECIFICATIONS <br /> shall be immediately reported to the ENGINEER,in writing,who shall promptly correct <br /> such inconsistencies or ambiguities in writing. WORK done by the CONTRACTOR <br /> after his discovery of such discrepancies,inconsistencies or ambiguities shall be done at <br /> the CONTRACTORS risk. <br /> 5. CONFORMANCE WITH STANDARD SPECIFICATIONS <br /> 5.1 All WORK shall conform with the requirements of the latest Standard Specifications as <br /> follows: <br /> 5.1a The Standard Utilities Specifications for Watermain and Service Line Installation <br /> and Sanitary Sewer and Storm Sewer Installation,as published by the League of <br /> Minnesota Municipalities. <br /> 5.lb The Standard Specifications for Construction as prepared by the Minnesota <br /> Department of Transportation. <br /> 5.1c The Standard Specifications which govern construction within the Municipality <br /> that the project is in. <br /> 5.2 The above requirements shall not be construed to permit a lower grade of construction <br /> where PLANS and specifications call for workmanship or MATERIALS of a higher <br /> grade. <br /> 6. SHOP DRAWINGS <br /> 6.1 The CONTRACTOR shall provide SHOP DRAWINGS as may be necessary for the <br /> prosecution of the WORK as required by the CONTRACT DOCUMENTS. The <br /> ENGINEER shall promptly review all SHOP DRAWINGS. The ENGINEER'S approval <br /> of any SHOP DRAWING shall not release the CONTRACTOR from responsibility for <br /> deviations from the CONTRACT DOCUMENTS. The approval of any SHOP <br /> DRAWING which substantially deviates from the requirement of the CONTRACT <br /> DOCUMENTS shall be evidenced by a CHANGE ORDER. <br /> 6.2 When submitted for the ENGINEER'S review,SHOP DRAWINGS shall bear the <br /> CONTRACTORS certification that he has reviewed,checked and approved the SHOP <br /> DRAWINGS and that they are in conformance with the requirements of the CONTRACT <br /> DOCUMENTS. <br /> 6.3 Portions of the WORK requiring a SHOP DRAWING or sample submission shall not <br /> begin until the SHOP DRAWING or submission has been approved by the ENGINEER. <br /> A copy of each approved SHOP DRAWING and each approved sample shall be kept in <br /> good order by the CONTRACTOR at the site and shall be available to the ENGINEER. <br /> 7. MATERIALS,SERVICES AND FACILITIES <br /> 7.1 It is understood that,except as otherwise specifically stated in the CONTRACT <br /> DOCUMENTS,the CONTRACTOR shall provide and pay for all MATERIALS, <br /> GC-4 <br />