Laserfiche WebLink
1.14 NOTICE OF AWARD—The written notice of the acceptance of the BID from the <br /> OWNER to the successful BIDDER. <br /> 1.15 NOTICE TO PROCEED—Written communication issued by the OWNER to the <br /> CONTRACTOR authorizing him to proceed with the WORK and establishing the date of <br /> commencement of the WORK. <br /> 1.16 OWNER—A public or quasi-public body or authority,corporation,association, <br /> partnership,or individual for whom the WORK is to be performed. <br /> 1.17 PLANS—The part of the CONTRACT DOCUMENTS which show the characteristics <br /> and scope of the WORK to be performed and which have been prepared or approved by <br /> the ENGINEER. <br /> 1.18 PROJECT—The undertaking to be performed as provided in the CONTRACT <br /> DOCUMENTS. <br /> 1.19 RESIDENT PROJECT REPRESENTATIVE—The authorized representative of the <br /> OWNER who is assigned to the PROJECT site or any part thereof. <br /> 1.20 SHOP DRAWINGS—All drawings,diagrams,illustrations,brochures,schedules and <br /> other data which are prepared by the CONTRACTOR,a SUBCONTRACTOR, <br /> manufacturer,SUPPLIER or distributor,which illustrate how specific portions of the <br /> WORK shall be fabricated or installed. <br /> 1.21 SPECIAL PROVISIONS—Additions and revisions to the standard and supplemental <br /> specifications covering conditions peculiar to and individual PROJECT. <br /> 1.22 SPECIFICATIONS—A part of the CONTRACT DOCUMENTS consisting of written <br /> descriptions of a technical nature of MATERIALS,equipment,construction systems, <br /> standards and workmanship. <br /> 1.23 SUBCONTRACTOR—An individual,firm or corporation having a direct CONTRACT <br /> with the CONTRACTOR or with any other SUBCONTRACTOR for the performance of <br /> a part of WORK at the site. <br /> 1.24 SUBSTANTIAL COMPLETION—That date as certified by the ENGINEER when the <br /> construction of the PROJECT or a specified part thereof is sufficiently completed,in <br /> accordance with the CONTRACT DOCUMENTS,so that the PROJECT or specified part <br /> can be utilized for the purposes for which it is intended. <br /> 1.25 SUPPLEMENTAL GENERAL CONDITIONS—Modifications to General Conditions <br /> required by a Federal agency for participation in the PROJECT and approved by the <br /> agency in writing prior to inclusion in the CONTRACT DOCUMENTS,or such <br /> requirements that may be imposed by applicable state laws. <br /> 1.26 SUPPLIER-Any person or organization who supplies MATERIALS or equipment for <br /> the WORK,including that fabricated to a special design,but who does not perform labor <br /> at the site. <br /> GC-2 <br />