Laserfiche WebLink
Client: Scherer Bros.Lumber-Arden Hills Yard Date: 11/21/2017 Page 20 of 48. <br /> L j — <br /> s, Project: LDK Homes Designer: Justin Spreitzer <br /> is Address:Address: 1525 Long Lake Blvd. Job Name: Tamosuinas Resid. <br /> Orono, MN Project : <br /> o)ec # <br /> Beam I S-P-F #2 2.000" X 10.000" 3-Ply - PASSED Level:Main Floor <br /> � I <br /> N p <br /> M ^ 9 1/4" <br /> .D c-4liil <br /> 1 SPF End Grain 2 SPF End Grain <br /> 4'9" 't' 't4 1/2" <br /> 4,9„ <br /> Multi-Ply Analysis <br /> Fasten all plies using 2 rows of l0d Box nails(.128x3")at 12"o.c.. Nail from both sides.Maximum end distance not to exceed <br /> 6" <br /> Capacity 0.0% <br /> Load 0.0 PLF <br /> Yield Limit per Foot 157.4 PLF <br /> Yield Limit per Fastener 78.7 lb. <br /> Yield Mode IV <br /> Edge Distance 1 1/2" <br /> Min.End Distance 3" <br /> Load Combination <br /> Duration Factor 1.00 <br /> Manufacturer Info Amerhart Ltd. <br /> 2631 Territorial Road,MN <br /> 55114 <br /> 800-879-8123-8�mQ a <br /> rt <br /> 5e+eeC the Order <br /> Version 2.0.05(Build 17.31.073)Powered by i5truct"' <br /> l"I.�I` <br />