Laserfiche WebLink
Client: Scherer Bros.Lumber-Arden Hills Yard Date: 11/21/2017 Page 18 of Ott <br /> 0 Project: LDK Homes Designer: Justin Spreitzer <br /> isDesign Address: 1525 Long Lake Blvd. Job Name: Tamosuinas Resid. <br /> Orono, MN Project#: <br /> Beam H S-P-F #2 2.000" X 10.000" 2-Ply - PASSED Level:Main Floor <br /> . . . � � l <br /> E\ <br /> -N 91/4" <br /> V1 <br /> J U L7-1/(7L / <br /> 1 SPF End Grain 2 SPF En Grain 3 SPF End Grain <br /> / <br /> 4'3" 4'3" t t3" <br /> / <br /> 8'6" <br /> Multi-Ply Analysis <br /> Fasten all plies using 2 rows of l0d Box nails(.128x3")at 12"o.c.. Maximum end distance not to exceed 6" <br /> Capacity 0.0% <br /> Load 0.0 PLF <br /> Yield Limit per Foot 157.4 PLF <br /> Yield Limit per Fastener 78.7 lb. <br /> Yield Mode IV <br /> Edge Distance 1 1/2" <br /> Min.End Distance 3" <br /> Load Combination <br /> Duration Factor 1.00 <br /> Manufacturer Info Amerhart Ltd. <br /> 2631 Territorial Road,MN <br /> 55114 <br /> 800-879-8123 <br /> riAmerhart <br /> Version 2.0.05(Build 17.31.073)Powered by iStructT" <br /> 1..* <br />