My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01606 - new structure
Orono
>
Property Files
>
Street Address
>
L
>
Long Lake Boulevard
>
1525 Long Lake Boulevard - 35-118-23-22-0002
>
Permits/Inspections
>
2017-01606 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:05 PM
Creation date
1/19/2018 10:40:42 AM
Metadata
Fields
Template:
x Address Old
House Number
1525
Street Name
Long Lake
Street Type
Boulevard
Address
1525 Long Lake Boulevard
Document Type
Permits/Inspections
PIN
3511823220002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> STRUCTURAL NOTES <br /> 1. DESIGN LOADS: <br /> Roof Live Load=40 PSF. <br /> Garage Live Load=50 PSF <br /> Floor Live Loads =40 PSF <br /> 2. FOUNDATIONS: <br /> a. ALL FOOINGS SHALL BEAR ON NATURAL UNDISURBED SOIL OR ON COMPACTED GRANULAR <br /> FILL.ALL FOOTINGS ARE DESIGNED USING AN ALLOWABLE SOIL BEARING PRESSURE OF <br /> 1,500 PSF. <br /> b. WALL FOOTING ELEVATION CHANGES SHALL BE STEPPED AT A RATIO OF 1(VERTICAL)TO 2 <br /> (HORIZONTAL. MAXIMUM VERTICAL STEP SHALL BE 2'0" UNLESS OTHERWISE NOTED. <br /> c. ALL EXTERIOR WALL FOOTINGS SHALL HAVE A MINIMUM SOIL COVER OF 3'-6" MEASURED <br /> FROM BOTTOM OF FOOTING UNLESS OTHERWISE NOTED. <br /> d. PROVIDE A 6"GRANULAR BASE AND 6 MILL POLY VAPOR BARRIER BENEATH ALL SLABS ON <br /> GRADE. THE VAPOR BARRIER SHALL BE PLACED DIRECTLY BENEATH THE SLAB.SEE <br /> ARCHITECTIRAL PLANS FOR OTHER REQUIREMKENTS. <br /> e. REINFORCE SLABS ON GRADE WITH 6X6'-10/10-WWF UNLESS SHOWN OTHERWISE. <br /> 3. CONCRETE: <br /> F'c=3000 STANDARD WEIGHT INTERIOR SLABS AND WALLS <br /> F,c=3000 STD.WT.AIR-ENTRAINED GARAGE AREA <br /> F'c= 4,000 STD.WT.AIR-ENTRAINED TOPPING IN GARAGE <br /> F,c=5000 OR 2500 WITH APPROVED ADMIXTURE FOOTINGS <br /> 4. FOUNDATION CONTRACTOR TO COORDINATE AND VERIFY ALL DIMENSIONS WITH THE <br /> ARCHITECTURAL PLANS. <br /> 5. SPECIAL ATTENTION TO DIMERNSIONS AT LOCATIONS ADJUSTED FOR NSULATION. <br /> 6. FOUNDATION CONTRACTOR TO COORDINATE AND VERIFY TOP OF WALL ELEVATIONS WITH THE <br /> FRAMING PLANS AND ARCHITECTURAL PLANS. <br /> 7. ANCHOR BOLTS TO BE IA INCH DIAMETER AT 4'-0'ON CENTER UNLESS NOTED OTHERWISE. <br /> LLI hereby certify that this plan,specification <br /> L! !arson lreport was prepared by me or under my <br /> . or i '2s �.oa«. cap �l�a <br /> di and that I am a duly <br /> 0 Q <br /> Larson Srofessional Engineer under thea , l J <br /> iLak•Drive <br /> Leesburg,FL� Structures,Inctnlaws of State of Minnesota. �ON. <br /> 6127472642 788 �G'� L....0(1 go Lae---FS <br /> internetarginewring@comcast,nel Date l -2.440 Licenser/831 Comm.No. 1,cc.g - 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.