My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01606 - new structure
Orono
>
Property Files
>
Street Address
>
L
>
Long Lake Boulevard
>
1525 Long Lake Boulevard - 35-118-23-22-0002
>
Permits/Inspections
>
2017-01606 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:05 PM
Creation date
1/19/2018 10:40:42 AM
Metadata
Fields
Template:
x Address Old
House Number
1525
Street Name
Long Lake
Street Type
Boulevard
Address
1525 Long Lake Boulevard
Document Type
Permits/Inspections
PIN
3511823220002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc. <br /> Sabre Plumbing&Heating 1525 Long Lake Blvd.Orono <br /> Plymouth,MN 55447 — - Page 2 <br /> Project Report <br /> General Project Information <br /> Project Title: 1525 Long Lake Blvd. Orono <br /> Designed By: Josh Gray <br /> Project Date: Tuesday, November 07, 2017 <br /> Client Name: LDK Homes <br /> Company Name: Sabre Heating And A/C <br /> Company Representative: Josh Gray <br /> Company Address: 15535 Medina Road <br /> Company City: Plymouth, Mn 55447 <br /> Company Phone: 763-473-2267 <br /> Company Fax: 763-473-8565 <br /> Company E-Mail Address: josh.gray@sabreheating.com <br /> Design Data <br /> Reference City: Minneapolis, Minnesota <br /> Building Orientation: Front door faces East <br /> Daily Temperature Range: Medium <br /> Latitude: 44 Degrees <br /> Elevation: 834 ft. <br /> Altitude Factor: 0.970 <br /> Outdoor Outdoor Outdoor Indoor Indoor Grains <br /> Dry Bulb Wet Bulb Rel.Hum Rel.Hum Dry Bulb Difference <br /> Winter: -15 -12.38 n/a 30% 72 29.40 <br /> Summer: 88 73 50% 50% 75 35 <br /> Check Figures <br /> Total Building Supply CFM: 1,694 CFM Per Square ft.: 0.400 <br /> Square ft. of Room Area: 4,233 Square ft. Per Ton: 1,170 <br /> Volume (ft3)of Cond. Space: 35,379 <br /> Building Loads <br /> Total Heating Required Including Ventilation Air: 63,606 Btuh 63.606 MBH <br /> Total Sensible Gain: 37,197 Btuh 86 % <br /> Total Latent Gain: 6,212 Btuh 14 % <br /> Total Cooling Required Including Ventilation Air: 43,408 Btuh 3.62 Tons (Based On Sensible + Latent) <br /> Notes <br /> Rhvac is an ACCA approved Manual J and Manual D computer program. <br /> Calculations are performed per ACCA Manual J 8th Edition, Version 2, and ACCA Manual D. <br /> All computed results are estimates as building use and weather may vary. <br /> Be sure to select a unit that meets both sensible and latent loads according to the manufacturer's performance data at <br /> your design conditions. <br /> M:\ ...\1525 Long Lake Blvd. Orono TAMOSUINAS.rh9 Tuesday, November 07, 2017, 6:44 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.