My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01606 - new structure
Orono
>
Property Files
>
Street Address
>
L
>
Long Lake Boulevard
>
1525 Long Lake Boulevard - 35-118-23-22-0002
>
Permits/Inspections
>
2017-01606 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:58:05 PM
Creation date
1/19/2018 10:40:42 AM
Metadata
Fields
Template:
x Address Old
House Number
1525
Street Name
Long Lake
Street Type
Boulevard
Address
1525 Long Lake Boulevard
Document Type
Permits/Inspections
PIN
3511823220002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 13.01 SERVICEABILTY <br /> Components required for the repair of the pump shall be shipped within a period of 24 hours. <br /> 14.01 FACTORY ASSEMBLED TANK SYSTEMS WITH GUIDE RAIL AND QUICK DISCONNECT DISCHARGE <br /> Guide factory mounted rail system with pump suspended by means of bolt on quick disconnect which is sealed by means of nitrile <br /> grommets.The Discharge piping shall be schedule 80 PVC and furnished with a check valve and PVC shut-off ball valve.The tank shall be wound <br /> fiberglass or roto-molded plastic.An inlet hub shall be provided with the fiberglass systems. <br /> Stainless steel Guide Rail <br /> Zinc plated steel Guide Rail <br /> "diameter of basin size <br /> "height of basin size <br /> "distance from top of tank to discharge pipe outlet <br /> Fiberglass cover <br /> Structural foam polymer cover <br /> Steel cover <br /> Simplex System with Outdoor panel and alarm <br /> Duplex System with Outdoor panel and alarm <br /> Separate Outdoor Alarm <br /> Remote Outdoor Alarm <br /> 15.01 TESTING <br /> The pump shall have a ground continuity check and the motor chamber shall be Hi-potted to test for electrical integrity,moisture content and <br /> insulation defects.The motor and volute housing shall be pressurized,and an air leak decay test is performed to ensure integrity of the motor <br /> housing.The pump shall be run,voltage current monitored,and the tester checks for noise or other malfunction. <br /> 16.01 QUALITY CONTROL <br /> The pump shall be manufactured in an ISO 9001 certified Facility. <br /> 17.01 WARRANTY <br /> Standard limited warranty shall be 3 years. <br /> 2448LSG_P8 R4/2/20I2 ©Copyright 2012 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.