My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/20/2017 Planning Commission Minutes
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Minutes
>
2010-2019
>
2017
>
03/20/2017 Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 4:13:02 PM
Creation date
1/18/2018 4:12:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION MEETING <br /> Monday,March 20,2017 <br /> 6:30 o'clock p.m. <br /> Gaffron asked to what extent the contractor for the county project will be involved in the operation of the <br /> site on a daily basis and to what extent the County will be involved in the site on a daily basis. <br /> Fretham indicated the County will not play a role in managing it and that Hennepin County would expect <br /> them to abide by the permit conditions. Fretham stated their expectation is that the contractor will <br /> manage the site on a daily basis and they will be monitoring their activities. <br /> Landgraver asked if they are looking at a three-year project. <br /> Fretham stated they hope it is a three-year project, but that if it does not work after a year,they will <br /> probably shut it down. Fretham stated he would like to try it for at least a year. <br /> Lemke asked what will happen with the site after the process is done. <br /> Fretham indicated they would need to restore the site to a similar condition as before. <br /> Lemke asked whether a deal breaker would be if there is a restriction on bringing in other materials from <br /> other sites. <br /> Fretham stated it could be since at this time he has not gotten a commitment from the contractor on how <br /> much material will be brought in. Fretham stated to his understanding the contractor is negotiating with <br /> the County to do some of it onsite at the road project. If that happens,that will reduce the amount of <br /> material being brought to the site. Fretham noted he has to look at the costs of tying up the property for a <br /> period of time versus the amount of materials to be brought in. <br /> Lemke asked him to address the question of pollution. <br /> Fretham indicated the contractor will be bringing in street materials,such as curb,concrete, asphalt, <br /> manholes and pipe. Fretham stated the material is fairly clean from a pollution standpoint,and if they <br /> were demoing a building,that would be a different process. <br /> Landgraver noted people are concerned about the old dump. Landgraver asked what government agency <br /> would look into the added weight and traffic to the site. <br /> Gaffron asked Mr. Fretham what discussions he has had with the MPCA regarding the site. Gaffron <br /> stated his understanding of what the gentleman questioning pollution was referring to is what happens if <br /> the landfill material is pushed further out or changes the drainage characteristics of the area. Gaffron <br /> stated there are a lot of things that go into a landfill and that he would like to know what the MPCA's <br /> views are on the proposed use for the site. <br /> Fretham indicated they have spoken with the MPCA but that they have not really spoken with them about <br /> the recycling activities. Fretham noted he has dealt with them before on other sites and that he <br /> understands their process and concerns. Fretham stated the MPCA's concern was more about the <br /> screening buffer since that is a permanent thing and that they will want to sign off on that. Fretham <br /> indicated he has hired Wenck Engineering for that component and that he can add that point to his <br /> discussions with them going into the future. <br /> Gaffron asked if the MPCA has a concern about the additional weight on the edges or the drainage being <br /> impacted. <br /> Page 14 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.