Laserfiche WebLink
DETERMINING PERMIT FEES <br /> ❑ SAC Charge(2013 Rate=$2,435.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> (If not prepaid,a sewer connection permit will not be issued) <br /> �Sewer Connection/Disconnect/\ epair($50.00/Per Stub) $ �� GU <br /> Pipe size ir3el�es,-ina�erial Schd 40 air tested; cast iron <br /> ❑ Water Connecdon/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑ Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availabilitv Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE (Add Lines 1-3 Above) $ CJ J��GU <br /> ADDITIONAL INFORMATION—WATER METERS <br /> ■ WATER METERS must be picked up and paid for at Orono City Hall,these are on a s�arate permit. <br /> ■ WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of ineter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work in strict accordance with the ordinances of the Ciry and the regulations of the State of <br /> Minnesota, and certifies t all state s e on this application are, true and correct. <br /> � <br /> / � ' <br /> Applican . Date: �J' �f 7-�-� <br />