Laserfiche WebLink
23) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio ';2.7 <br /> 24) 10 percent site slope (0-20% range) 10 (%downslope site slope, if different than upslope) <br /> 25) 12 inches, or 1.0 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains 0 inches of 0%soil credit, and 0 inches of 50%soil credit. Giving a: <br /> 26) 24 inch, or 2.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed)of: <br /> 29) 4:1 upslope ratio 11 ft. upslope berm <br /> 30) 3:1 sideslope 15 ft. sideslope berms <br /> 31) 3:1 downslope 21 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br /> 42 ft.wide by 93 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> Upslope berm 11 { Downslope berm 21 <br /> N 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> 2.0 Clean sand lift <br /> 1.0 1 Depth to Limiting <br /> Limiting Condition — ------------ - _ <br /> Absorption Width I 27.0 (`-----*---------_—_ <br /> Note: <br /> For 0 to 1%slopes,Absorption Width is measured from the Bee/equally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the &d. <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by 6 inches under pipe, plus 20%gives 21 yd'or*1.4= 29 ton <br /> 34) Mound Sand: (note:volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 40.5 up + 110.6 downstope + 17.8 ends+ 58.3 under rock 273 yd3 or*1.4= 382 ton <br /> plus 20% <br /> 35) Loamy Cap: <br /> 38 ft. by 89 ft. 6"deep, plus 20%gives 76 yd'or*1.4= 106 ton <br /> 36) Topsoil: <br /> 42 ft. by 93 ft. 6"deep,plus 20%gives 87 yd'or*1.4= 122 ton <br /> I hereby c ify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> Rusty Olson"s Soil Et Perc 810 10/17/2017 <br /> esigner Signature Company License# Date <br />