My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01341 - new structure
Orono
>
Property Files
>
Street Address
>
M
>
Mooney Lake Drive (Formeraly 300 Sixth Ave N)
>
1020 Mooney Lake Drive - 25-118-23-41-0012
>
Permits/Inspections
>
2017-01341 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:01 PM
Creation date
1/12/2018 2:36:52 PM
Metadata
Fields
Template:
x Address Old
House Number
1020
Street Name
Mooney Lake
Street Type
Drive
Address
1020 Mooney Lake Drive
Document Type
Permits/Inspections
PIN
2511823410012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24) 3 percent site slope (0-20%range) 3 (%downslope site slope, if different than upslope) <br /> 25) 12 inches, or 1.0 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains 0 inches of 0%soil credit, and 0 inches of 50%soil credit. Giving a: <br /> 26) 24 inch, or 2.0 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths(topsoil beyond rockbed)of: <br /> 29) 4:1 upslope ratio 14 ft. upslope berm <br /> 30) 3:1 sideslope 13 ft. sideslope berms <br /> 31) 4:1 downslope 21 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br /> 45 ft. wide by 89 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> Upslope berm 14 a Downslope berm 21 <br /> 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> 2.0 Clean sand lift <br /> __ I 1.0,1__Depth to Limiting <br /> Limiting Condition _" __ ___ <br /> Absorption Width f 27.0 I__"_` —— _ <br /> Note: <br /> For 0 to 1%slopes, Absorption Width is measured from the Bedequally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by 6 inches under pipe, plus 20%gives 21 yd'or*1.4= 29 ton <br /> 34) Mound Sand: (note:volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 48.2 up + 74.2 downslope + 12.1 ends+ 50.2 under rock= 222 yd'or*1.4= 310 ton <br /> plus 20% <br /> 35) Loamy Cap: <br /> 41 ft. by 85 ft. 6"deep, plus 20%gives 78 yd°or*1.4= 109 ton <br /> 36) Topsoil: <br /> 45 ft. by 89 ft. 6"deep, plus 20%gives 89 yd'or*1.4= 125 ton <br /> I hereby c tify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> Rusty Olson"s Soil E Perc 810 10/17/2017 <br /> signer Signature Company License# Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.