My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-011761 - heat/ac/vent
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
4140 North Shore Drive - 07-117-23-44-0052
>
Permits/Inspections
>
1999-011761 - heat/ac/vent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:40:31 PM
Creation date
1/10/2018 10:31:49 AM
Metadata
Fields
Template:
x Address Old
House Number
4140
Street Name
North Shore
Street Type
Drive
Address
4140 North Shore Dr
Document Type
Permits/Inspections
PIN
0711723440052
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. - � I <br /> � p � � � ��� <br /> � � <br /> CITY OF ORONO � APPLICATION FOR MECHANICAL PERMI'T <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical DesiQns - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shali aiso be provided. <br /> 4. When any new construction or remodeling is involved, a sepazate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code 'I <br /> requirements. !; <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. ;� <br /> 7. House Heating Test Record must be submitted before final. t <br /> � <br /> Instructions Complete all items on this application. Compute the pemut fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> �_; <br /> Please check one: �� New Addition Repair Replace <br /> � IR�si e tial Commercial <br /> JOB STTE: �n {Q �(`' ZIP: <br /> Owner's Name: ' w1 C �Cc'U Teleph�e Number: <br /> Mailing Address: ���-} �l'"� p t'�e-' r- City: ���r� Zip: <br /> Contractor's Name: � 'e h � Tele hone N ber: '� -?36� <br /> Mailing Address: � . � City: �fl l7� ZiP: � <br /> SFSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity: � _ <br /> Make: <br /> Model: �? 1� <br /> Fuel: � <br /> Flue Size: � " <br /> Input BTUs: a�� <br /> Output BTUs: �G��' <br /> CFl�2: �o� <br /> COOLING SYSTEMS <br /> Quantity: t <br /> Make: <br /> Model: �`0 � <br /> Tons: "� � <br /> R <br /> H. Power ' <br /> W <br /> � x � �� � � 2��� <br /> �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.