Laserfiche WebLink
. . � � <br /> EXHIBIT B: Rework Costs incurned due to Water and Sewer misinformation from City of Orono <br /> 1. Cost of providing h�affic control <br /> 2. Digging a 13 foot hole to connect the sewer and than filling in the hole because the depth to the <br /> connection point of the sewer from the city was in error. <br /> 3. Temporary backfilling of the hole in County Rd. 19 due to the hole having to be refilled without <br /> connecting the sewer service. <br /> 4. Core drilling of M.H. and doing inside drop to the 22-foot level. <br /> 5. Labor cost/machine cost/as a result of incorrect information(records)provided by the city. <br /> 6. Lost time on project due to having to reschedule the connection of the sewer and water <br /> connection. <br /> 7. The cost of removing old M.H.that was not on records provid�by the city. This M.H.had been <br /> fille�with sand at the time it was removed from service. <br />