Laserfiche WebLink
- ��� <br /> O 4 <br /> C ITY of 4RON0 <br /> � .�. � <br /> ti <br /> ��t �G�' RESOLUTION OF THE CITY COUNCIL <br /> `�kEsKo4` rvo. 5 4 �4 <br /> 2. Driveway Access. Driveway access to Lots 1 and 3 shall be a shared driveway <br /> within Outlot A. Driveway access to Lots 4 and 5 shall be a shared driveway <br /> within Outlot B. The existing driveway access onto Shadywood Road for Lot 2 <br /> shall remain. All other curb cuts or access points onto the adjacent County Roads <br /> shall be removed. The developer shall establish the appropriate shared driveway <br /> easements and maintenance covenants over Outlots A and B. Developer shall <br /> provide copies of approved Hennepin County permits for driveway access <br /> locations for Outlots A and B. <br /> 3. Municipal Sewer. The property was completely assessed for municipal sewer on <br /> a front footage basis as part of the 1965-LS-lA project, and no further sewer <br /> connection charges are required (MCES SAC charges will be due for each of Lots <br /> 3 and 4 at the time building permits aze issued; Lot 1 is credited for 1 SAC unit <br /> due to the recent removal of the existing house which was connected to sewer). <br /> 4. Municipal Water. The property was assessed for complete front footage but <br /> only 3 water units as part of the 1970-LW-lA municipal water project, hence an <br /> additional water unit will be due for each of Lots 3 and 4 respectively, to be <br /> collected at the time of building permit issuance for each of Lots 3 and 4, at a <br /> cost per the 2005 fee schedule of$2,520.00 per unit. <br /> 5. Development Fees <br /> A. Park Dedication Fee. The subdivision is subject to the standard Park <br /> Dedication Fee requirement. Because the value of each newly created lot is <br /> expected to be in excess of the threshold value of$69,375.00, the 8% park fee cap <br /> of$5,550 per lot will apply. A Park Dedication Fee will be due for Lots 3 and 4, <br /> calculated as follows: <br /> 2 lots a $5,�50/lot = $11,100. <br /> B. Storm Water and Draina�e Trunk Fee. The subdivision is subject to the <br /> standard Storm Water and Draina�e Trunk Fee; established in the 2005 fee <br /> schedule as $4,160 per acre for the 1/� acre zone. The Storm Water Drainage and <br /> Trunk Fee is calculated as follows: <br /> 3.85 gross acres x $4,160/acre= �16,016. <br /> PaQe 4 of 9 <br />