My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00758 - new structure
Orono
>
Property Files
>
Street Address
>
M
>
Mooney Lake Drive (Formeraly 300 Sixth Ave N)
>
1175 Mooney Lake Drive - 25-118-23-41-0017
>
Permits/Inspections
>
2016-00758 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:09 PM
Creation date
12/8/2017 11:18:00 AM
Metadata
Fields
Template:
x Address Old
House Number
1175
Street Name
Mooney Lake
Street Type
Drive
Address
1175 Mooney Lake Drive
Document Type
Permits/Inspections
PIN
2511823410017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Erosion Control Supplemental Information <br /> Final Stabilization will be provided with(seed,sod,etc): ew>bt 6a E Seto <br /> and 6 inches of topsoil will be added/replaced prior to final stabilization. <br /> Concrete Washout:Location of concrete washout <br /> Off site _Indicated on site plans _Other(description): No concrete washout: <br /> Vegetation:Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater,of all vegetation to be retained. <br /> 1 Yes _Not Applicable Other(description): <br /> Inspections:An erosion control inspection plan is required for all projects disturbing'A acre or <br /> greater.The inspection requirements are as follows: <br /> 1) The individual identified as being responsible for implementing the erosion control <br /> plan must routinely inspect the construction site once every seven days during active <br /> construction and within 24 hours after a rainfall event greater than 0.5 inches in 24 <br /> hours. <br /> 2) All inspections and maintenance conducted during construction must be recorded in <br /> writing and these records must be retained with the erosion control plan and made <br /> available at the District's request within 24 hours.Records of each inspection and <br /> maintenance activity shall include: <br /> i. Date and time of inspections; <br /> ii. Name of person conducting inspections; <br /> iii. Findings of inspections,including recommendations for corrective actions; <br /> iv. Corrective actions taken(including dates,times and party completing <br /> maintenance activities);and <br /> v. Date and amount of all rainfall events greater than 0.5 inches in 24 hours. <br /> Provide the following information for the primary individual responsible for implementing the erosion <br /> control plan: / LI1(( <br /> Name ChM. 2SV4 11 <br /> Organization (L iLS W�h i3Omeami <br /> Phone 412. 3E9-178/ Alternate Phone ivla-84" 4844 <br /> Email _ j IP)'1 t @ C-h arLsS Cuol c).to n. <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity willbe conducted in compliance with this rule. <br /> ?dee-.0.1-4-#2iv A8/4/4 <br /> Sign a of Applicant or Authorized Agent Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.