My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00758 - new structure
Orono
>
Property Files
>
Street Address
>
M
>
Mooney Lake Drive (Formeraly 300 Sixth Ave N)
>
1175 Mooney Lake Drive - 25-118-23-41-0017
>
Permits/Inspections
>
2016-00758 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:09 PM
Creation date
12/8/2017 11:18:00 AM
Metadata
Fields
Template:
x Address Old
House Number
1175
Street Name
Mooney Lake
Street Type
Drive
Address
1175 Mooney Lake Drive
Document Type
Permits/Inspections
PIN
2511823410017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enter the Component Length: ft Enter the Component Width: ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> ft : ft = components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> components X ft = ft <br /> E. Number of Rows= Bed Width divided by Component Width (Round up) <br /> ft = ft = rows Adjust width so this is an whole number. <br /> F. Total Number of Components= Number of Components per Row X Number of Rows <br /> X = components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition = Clean Sand Lift <br /> 3.0 ft - 2.2 ft = 1.0 ft Design Sand Lift (optional): ft <br /> B. Calculate Upslope Height: Clean Sand Lift + media depth + cover(1 ft.) = Upslope Height <br /> 1.0 ft + 1.0 ft + 1.0 ft = 3.0 ft <br /> C. Select Upslope Berm Multiplier(based on land slope): 3.85 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 3.33 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upslope Mound Height = Upslope Berm Width <br /> 3.85 ft X 3.0 ft = 11.6 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope : 100 = Drop (ft) <br /> 10.0 ft X 6.0 % : 100 = 0.60 ft <br /> F. Calculate Downslope Mound Height: Upslope Height + Drop in Elevation = Downslope Height <br /> 3.0 ft + 0.60 ft = 3.6 ft <br /> G. Select Downslope Berm Multiplier (based on land slope): 5.26 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1, 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 5.26 x 3.6 ft = 18.9 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width + 4 feet <br /> 16.0 ft + 4 ft = 20.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 20.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height = Endslope Berm Width <br /> 3.00 ft X 3.6 ft = 10.8 ft <br /> M. Calculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 11.6 ft + 10.0 ft + 20.0 ft = 41.6 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 10.8 ft + 63.0 ft + 10.8 ft = 84.6 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.