My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-00758 - new structure
Orono
>
Property Files
>
Street Address
>
M
>
Mooney Lake Drive (Formeraly 300 Sixth Ave N)
>
1175 Mooney Lake Drive - 25-118-23-41-0017
>
Permits/Inspections
>
2016-00758 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:09 PM
Creation date
12/8/2017 11:18:00 AM
Metadata
Fields
Template:
x Address Old
House Number
1175
Street Name
Mooney Lake
Street Type
Drive
Address
1175 Mooney Lake Drive
Document Type
Permits/Inspections
PIN
2511823410017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joseph Olson D.B.A. <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License #810 <br /> 11481 Riverview Rd. NE, Hanover, MN 55341 <br /> (763) 498-8779 fax (763) 498-8290 <br /> April 22,2015 <br /> Mooney Lake Preserve <br /> Proposed lot 1,Block 2 W( h(,6 txr S� 8 Lc I J\ <br /> 300 Sixth Ave.N. <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is partially designed for a Type 1,five-bedroom home in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> Once the house size, location and septic primary and future sites are chosen this design can be completed. <br /> The periodically saturated soils were located at 24-30 Inches(mottled soil).Due to the periodically <br /> saturated soils,a pressurized mound system will need to be installed to treat the septic effluent.The bottom <br /> of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12"have a percolation rate averaging 11 MPI. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area.The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure.A <br /> warning device must be installed with a light and sound device;this is in case of a pump failure. <br /> Use 7/32 inch perforations on the laterals. <br /> Keep all heavy equipment off of the proposed treatment areas before and after construction.The <br /> treatment area must be fenced off before construction begins.This Design is not valid&the System <br /> will need to be relocated if failure to protect the areas proposed for the On-Site Sewage Treatment <br /> systems occurs. <br /> Nothing other than gray water,(laundry,showers,act.)human water&toilet tissue should be disposed of <br /> into the septic tanks. Garbage disposals are not recommended.Additives must not be used;they may cause <br /> harmful damage to your septic system.It is recommended that you pump the septic tank s every two years. <br /> Sincerely, <br /> Joseph J. Olson <br /> RECEIVED <br /> APR 222015 <br /> CITY OF ORONO <br />
The URL can be used to link to this page
Your browser does not support the video tag.