Laserfiche WebLink
, , <br /> Memorandum �Bonestroo <br /> Date: 2335 Highway 36 W <br /> To: Evelyn Turner Project: 3768 North Shore Drive 10/25/20 St.Paul,MN 55113 <br /> Q] Tel 651-636�1600 <br /> Fax 651�36-1311 <br /> From: John Smyth,CWD Client: City or Orono <br /> wwuu.bonestroo.com <br /> Re: Wetland Buffer Ordinance Review Memo File No: 139-07000-1 <br /> Remarks: <br /> Per section 78-1601 of the Wetland Ordinance the new home construction will <br /> trigger wetland buffers and setback for the proposed project at 3768 North <br /> Shore Drive. According to the submitted building plan one wetland has been <br /> delineated within the property boundaries at 3768 North Shore Drive (Cty 19). <br /> The wetland is classified as Preserve and requires a 50 foot upland buffer and <br /> 20 foot setback from the buffer. The survey appears to show a 25 foot buffer <br /> on Lots 3, 4, and 5 and a larger buffer on lots 1 and 2. Although not formally <br /> requested it appears the applicant may be proposing buffer flexibility as <br /> described under 78-1608 (3)Noncoformities. This does not appear to be <br /> appropriate because this is a proposed new structure and"nonconformities" as <br /> described in the Wetland Ordinance require an existing structure to be present. <br /> Buffer Condition and Requirements <br /> A site evaluation was completed on 25 October 2007 to determine the <br /> condition of the vegetation in the existing upland buffer. Currently a large <br /> portion of the buffer is turf grass and the remainder of the buffer has been left <br /> in a natural wooded condition. The wooded portion of the buffer currently <br /> contains buckthorn. According to Division 3 sec. 78-1605 turf grass and <br /> buckthorn are considered to be an undesirable plant species and should be <br /> removed from the buffer area. After the turf is removed it is required to be <br /> planted or seeded with native species. <br /> The applicant will need to provide a Management/Landscaping plan that <br /> includes the following: <br /> 1. Method proposed to be used to control buckthorn (MN DNR website <br /> source for options). All buckthorn removal should be done using hand <br /> tools as large equipment can further disrupt the wetland buffer. At a <br /> minimum buckthorn should be cut and the remaining stems should be <br /> treated with an approved herbicide following label instructions. <br /> Treating the cut stumps will help prevent regrowth of the buckthorn. <br />