Laserfiche WebLink
• = BO LTON 8� M �N K , I N C� <br /> . . Consulting Engineers & Surveyors <br /> �� 2638 Shadow Lane, Suite 200•Chaska, MN 55318-1172 <br /> Phone(952)448-8838•Fax(952)448-8805 <br /> www.bolton-menk.com <br /> June 24,2014 <br /> City of Orono <br /> Attn: Melanie Curtis <br /> 2750 Kelley Parkway <br /> Orono, MN 55356 <br /> RE: Building Permit Application 2014-00603 <br /> 3655 North Shore Drive <br /> Engineering Review#1 <br /> Dear Melanie, <br /> As requested, we have completed an engineering review of the documents submitted for the above <br /> referenced project. Our current review is based on the following submittal items: <br /> • Building Permit Application, dated 6/13/14 <br /> • Grading Plan prepared by Kemper&Associates, dated 3/7/14 <br /> • Building Plans and Elevations prepared by John Bradley, dated 6/5/14 <br /> • City Council Resolution granting approval of variances and CUP <br /> We offer the following observations,comments, and recommendations for your consideration: <br /> 1. Perimeter silt fence should be installed and inspected by the City prior to any land disturbing activity. <br /> The Contractor must provide 24 hour notice prior to inspection. <br /> 2. A rock construction entrance should be installed at the entrance to the site to limit tracking of <br /> sediment off-site. The entrance should be installed prior to any land disturbing activity. <br /> 3. The 12" spruce tree on the southwest corner of the building may interfere with the proposed swale <br /> directing runoff from the front of the residence to the lake. The tree may have to be removed or the <br /> swale slightly relocated to ensure a proper drainage way is provided. This work should be <br /> coordinated in the field with the City Engineer. <br /> 4. A financial security of$2,000 from the Applicant is recommended for erosion control and <br /> engineering oversight. The financial security is intended to provide protection in the event that it <br /> becomes necessary for the City to install or maintain erosion and sediment control within the project <br /> area and covers the cost of vegetation re-establishment if the applicant is unable to follow through <br /> with the conditions of approval. <br /> 5. The applicant will be required to obtain Minnehaha Creek Watershed District(MCWD) approval and <br /> permitting for their Erosion Control Rule. A copy of any approvals or permits required should be <br /> submitted prior to any work. <br /> DESIGNING FOR A BETTER TOMORROW <br /> Bolton&Menk is an equal opportunity employer <br />