Laserfiche WebLink
in recordable form, a release of any lot in the Plat from this Development Contract if the City determines that <br />the terms and conditions of this Contract have been satisfied. <br />J. Retaining walls that require a building permit shall be constructed in accordance <br />with plans and specifications prepared by a structural or geotechnical engineer licensed by the State of <br />Minnesota. Following construction, a certification signed by the design engineer shall be filed with the City <br />Engineer evidencing that the retaining wall was constructed in accordance with the approved plans and <br />specifications. All retaining walls required to be constructed by the PIans, or special conditions referred to in <br />this Contract, shall be constructed before any Certificate of Occupancy is issued for a lot on which a retaining <br />wall is required to be built. <br />K. Developer shall be responsible for all snow removal from vacant lots to the extent <br />that City Ordinance requires snow removal. Developer shall be responsible for ensuring that all vacant lots <br />comply with the City's Code regarding nuisances. <br />30. NOTICES. Required notices to the Developer shall be in writing, and shall be either hand <br />delivered to the Developer, its employees or agents, or mailed to the Developer by certified mail at the <br />following address: 220 Stubbs Bay Road, Orono, MN 55356. Notices to the City shall be in writing and shall <br />be either hand delivered to the City Administrator, or mailed to the City by certified mail in care of the City <br />Administrator at the following address: Orono City Hall, 2750 Kelley Parkway, Orono, Minnesota 55356. <br />Either party may change the address to which notices to such party thereafter shall be given, by providing to <br />the other party notice of such change. <br />190443x/2 15 <br />